Paper | Title | Page |
---|---|---|
MOYA03 | Progress of the RAON | 36 |
|
||
Funding: This work was supported by the Institute for Basic Science funded by the Ministry of Science, ICT and Future Planning (MSIP) and the National Research Foundation (NRF) under Contract 2013M7A1A1075764 Construction of the RAON heavy ion accelerator facility is in-progress in Korea. The driver linac is a superconducting linac with 200 MeV/u for uranium beam and 400 kW beam power. Prototyping of major components and their tests are proceeding including superconducting cavities, superconducting magnets and cryomodules. December 2016, the RFQ accelerated oxygen beam. Status report of the RAON accelerator systems is presented. |
||
![]() |
Slides MOYA03 [10.275 MB] | |
DOI • | reference for this paper ※ https://doi.org/10.18429/JACoW-SRF2017-MOYA03 | |
Export • | reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml) | |
MOPB087 | Frequency Tuner Development and Testing at Cornell for the RAON Half-wave-resonator | 266 |
|
||
The half-wave-resonators (HWRs) for the RAON project require a slow frequency tuner that can provide >80 kHz tuning range. Cornell University is currently in the process of designing, prototyping, and testing this HWR tuner. In this paper, we present the optimized tuner design, prototype fabrication, test insert preparation, and cryogenic test results. The performance of the tuner is analysed in detail. | ||
DOI • | reference for this paper ※ https://doi.org/10.18429/JACoW-SRF2017-MOPB087 | |
Export • | reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml) | |
TUPB008 | Performance of SRF Half-wave-resonators Tested at Cornell for the RAON Project | 396 |
|
||
Two prototype half-wave-resonators (HWR; 162.5MHz and β=0.12) for the RAON project were tested at Cornell University. In this paper, we report and analyse detailed results from vertical tests, including tests of the HWRs without and with helium tank. Surface preparation at Research Instruments is discussed, as well as the development of new HWR preparation and test infrastructure at Cornell. | ||
DOI • | reference for this paper ※ https://doi.org/10.18429/JACoW-SRF2017-TUPB008 | |
Export • | reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml) | |