Paper | Title | Page |
---|---|---|
MOPB076 | Horizontal RF Test of a Fully Equipped 3.9 GHz Cavity for the European XFEL in the DESY AMTF | 301 |
|
||
In order to validate the cavity package concept before the module preparation for the European XFEL Injector, one 3.9 GHz cavity, complete with magnetic shielding, power coupler and frequency tuner was tested in a specially designed single cavity cryomodule in one of the caves of the DESY Accelerator Module Test Facility (AMTF). The cavity was tested in high power pulsed operation up to the quench limit of 24 MV/m, above the vertical test qualifications and all subsystems under test (coupler, tuner, waveguide tuners, LLRF system) were qualified to design performances. | ||
Export • | reference for this paper to ※ BibTeX, ※ LaTeX, ※ Text, ※ RIS/RefMan, ※ EndNote (xml) | |
TUPB013 | Fermilab Cryomodule Test Stand Design and Plans | 566 |
|
||
Funding: Operated by Fermi Research Alliance, LLC under Contract No. DE-AC02-07CH11359 with the United States Department of Energy. A facility dedicated to SRF cryomodule testing is under construction at Fermilab. The test stand has been designed to be flexible enough to cool down and power test full length TESLA-style 8-cavity cryomodules as well cryomodules for low-β acceleration. We describe the design considerations, status, and near future plans for utilization of the test stand. |
||
![]() |
Poster TUPB013 [5.146 MB] | |
Export • | reference for this paper to ※ BibTeX, ※ LaTeX, ※ Text, ※ RIS/RefMan, ※ EndNote (xml) | |
TUPB014 | First Operation of a Superconducting RF Electron Test Accelerator at Fermilab | 571 |
|
||
Funding: Operated by Fermi Research Alliance, LLC under Contract No. DE-AC02-07CH11359 with the United States Department of Energy. A test accelerator utilizing SRF technology recently accelerated its first electrons to 20 MeV at Fermilab. Foreseen enhancements will make acceleration to 300 MeV possible at a maximum beam power of 80 kW. A summary of commissioning steps and first experiments as well as current beam parameters compared to design is presented. Plans for expansion and the future physics program are also summarized. |
||
![]() |
Poster TUPB014 [11.582 MB] | |
Export • | reference for this paper to ※ BibTeX, ※ LaTeX, ※ Text, ※ RIS/RefMan, ※ EndNote (xml) | |
TUPB018 | Preparation of the 3.9 GHz System for the European XFEL Injector Commissioning | 584 |
|
||
The 3.9 GHz cryomodule and RF system for the XFEL Injector is being assembled and delivered to the underground building in summer 2015, for the injector commissioning in Fall 2015. This contribution outlines the status of the activity and reports the preparation stages of the technical commissioning of the system. | ||
Export • | reference for this paper to ※ BibTeX, ※ LaTeX, ※ Text, ※ RIS/RefMan, ※ EndNote (xml) | |
FRAA03 | High Gradient Performance in Fermilab ILC Cryomodule | 1432 |
|
||
Funding: Operated by Fermi Research Alliance, LLC under Contract No. DE-AC02-07CH11359 with the United States Department of Energy. Fermilab has assembled an ILC like cryomodule using U.S. processed high gradient cavities and achieved an average gradient of 31.5 MV/m for the entire cryomodule. Test results and challenges along the way will be discussed. |
||
![]() |