Author: Krasnov, A.A.
Paper Title Page
TUYMH03 Recommissioning and Perspectives of VEPP-2000 Complex 39
 
  • Yu. A. Rogovsky, V.V. Anashin, D.E. Berkaev, A.S. Kasaev, E. Kenzhebulatov, I. Koop, A.A. Krasnov, G.Y. Kurkin, A.N. Kyrpotin, A.P. Lysenko, S.V. Motygin, E. Perevedentsev, V.P. Prosvetov, A.V. Semenov, A.I. Senchenko, P.Yu. Shatunov, Y.M. Shatunov, D.B. Shwartz, A.N. Skrinsky, I.M. Zemlyansky, Yu.M. Zharinov
    BINP SB RAS, Novosibirsk, Russia
  • D.B. Shwartz
    NSU, Novosibirsk, Russia
 
  VEPP-2000 is electron-positron collider exploiting the novel concept of round colliding beams. After three seasons of data taking in the whole energy range of 160-1000 MeV per beam it was stopped in 2013 for injection chain upgrade. The linking to the new BINP source of intensive beams together with booster synchrotron modernization provides the drastic luminosity gain at top energy of VEPP-2000. Recomissioning status, fist results and perspectives of the VEPP-2000 complex will be presented.  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
WECBMH02 Collector Ring Project at FAIR: Present Status 86
 
  • P.Yu. Shatunov, V.V. Anashin, E.A. Bekhtenev, D.E. Berkaev, M.I. Bryzgunov, D. Gurov, A.S. Kasaev, V.V. Kolmogorov, I. Koop, A.A. Krasnov, O.I. Meshkov, Yu. A. Rogovsky, T.V. Rybitskaya, A.V. Semenov, Y.M. Shatunov, S.V. Shiyankov, D.B. Shwartz, A.A. Starostenko, A.V. Sukhanov, A.S. Tsyganov, A.V. Utkin
    BINP SB RAS, Novosibirsk, Russia
 
  In November 2013, the FAIR management delegated the responsibility for the technical design, construction, installation, and commissioning of the whole CR and its components from GSI to Budker Institute of Nuclear Physics (BINP). Since that time a lot of modifications of the original design were made aiming to improve the beam parameters and the machine performance. This work shows the present status of the development.  
slides icon Slides WECBMH02 [20.497 MB]  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
TUPSA001 Commissioning of e+/e Transfer Line from BINP Injection Complex to VEPP-2000 Facility 213
 
  • I.M. Zemlyansky, Yu. Aktershev, V.V. Anashin, A.V. Andrianov, A.M. Batrakov, O.V. Belikov, D.E. Berkaev, M.F. Blinov, B.A. Dovzhenko, F.A. Emanov, V.V. Gambaryan, V.A. Kiselev, I. Koop, A.A. Krasnov, I.A. Mikheev, D.A. Nikiforov, A.V. Otboev, A.V. Pavlenko, V.P. Prosvetov, V.V. Rashchenko, Yu. A. Rogovsky, A.V. Semenov, P.Yu. Shatunov, Y.M. Shatunov, D.B. Shwartz, A.A. Starostenko, S.S. Vasichev, V.D. Yudin, Yu.M. Zharinov
    BINP SB RAS, Novosibirsk, Russia
  • A.A. Krasnov, A.V. Pavlenko, Yu. A. Rogovsky, D.B. Shwartz, A.A. Starostenko
    NSU, Novosibirsk, Russia
 
  Funding: The work is supported by the Ministry of Education and Science of the Russian Federation and by grant NSh-10088.2016.2.
Commissioning of e+/e transfer line from Injection Complex to VEPP-2000 facility is done in 2016. Both electrons and positrons beams are injected to VEPP-2000 collider. The channel layout, lattice functions, magnetic elements, beam diagnostic system, vacuum system and control system are presented in this article. The details of commissioning process are also mentioned.
 
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
THPSC017 A Synchrotron Radiation Beamline Installed at BINP to Study the High Luminosity LHC Vacuum System 572
 
  • A.A. Krasnov, V.V. Anashin, A.M. Semenov, D.B. Shwartz
    BINP SB RAS, Novosibirsk, Russia
  • V. Baglin, P. Chiggiato, B. Henrist
    CERN, Geneva, Switzerland
  • D.B. Shwartz
    NSU, Novosibirsk, Russia
 
  In the framework of the HL-LHC project, the vacuum performance of new surface material needs to be studied. In particular, a-C coating is proposed as an anti-multipactor surface in the HL-LHC Inner Triplets. Since the protons in the HL-LHC Inner Triplets will generate synchrotron radiation (SR) with ~ 10 eV critical energy and ~ 1016 ph/m/s flux, it is therefore of great importance to study the impact of such photons on a-C coating held at room and cryogenic temperature and compare the results against present LHC material. This paper describes construction and parameters of experimental set-up based on new Synchrotron Radiation beamline from booster synchrotron BEP at BINP. The experimental program releasing in collaboration between CERN and BINP for performing measurements of photon stimulated gas desorption, photon distribution and photo-electron emission provoked by synchrotron radiation are presented  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)