Author: Lysenko, A.P.
Paper Title Page
TUY01 Status and Perspectives of the VEPP-2000 Complex 6
 
  • Yu. A. Rogovsky, D.E. Berkaev, A.S. Kasaev, I. Koop, A.N. Kyrpotin, A.P. Lysenko, E. Perevedentsev, V.P. Prosvetov, A.L. Romanov, A.I. Senchenko, P.Yu. Shatunov, Y.M. Shatunov, D.B. Shwartz, A.N. Skrinsky, I.M. Zemlyansky, Yu.M. Zharinov
    BINP SB RAS, Novosibirsk, Russia
  • Yu. A. Rogovsky
    NSU, Novosibirsk, Russia
 
  The VEPP-2000 is a modern electron-positron collider at BINP. Last season in 2012–2013 was dedicated to the energy range of 160520 MeV per beam. The application of round colliding beams concept along with the accurate orbit and lattice correction yielded the high peak luminosity of 1.21031 cm-2s−1 at 500 MeV with average luminosity of 0.91031 cm-2s−1 per run. The peak luminosity limited only by beam-beam effects, while average luminosity – by present lack of positrons in whole energy range of 1601000 MeV. To perform high luminosity at high energies with small dead time the top-up injection is needed. At present new electron and positron injection complex at BINP is commissioned and ready to feed VEPP-2000 collider with intensive beams with energy of 450 MeV. Last calendar 2014 year was dedicated to the full/partial upgrade of complex's main parts.  
slides icon Slides TUY01 [4.152 MB]  
 
THPSC27 Modernization of VEPP-2000 Control System 377
 
  • Yu. A. Rogovsky
    NSU, Novosibirsk, Russia
  • D.E. Berkaev, O.V. Gorbatenko, A.P. Lysenko, Yu. A. Rogovsky, A.L. Romanov, A.I. Senchenko, P.Yu. Shatunov, Y.M. Shatunov
    BINP SB RAS, Novosibirsk, Russia
 
  Electron-positron collider VEPP-2000 delivered data for the high energy physics since the end of 2009. In the summer of 2013 the long shutdown was started dedicated to the deep upgrade of the wide range of subsystems. The main goal of the improvements is to reach or exceed design luminosity in the whole energy range from 200 MeV to 1000 MeV per bunch. The hardware of the accelerator complex consists of high current main field power supplies, low current power supplies for steering and multipole magnets, pulsed power supplies for channel's elements, RF subsystems, BPM and some other special subsystems (such as vacuum, temperature, etc.). The control system is based on CANbas, CAMAC and VME devices. The wide range of software corresponding to specific hardware subsystems forms complicated interacting system that manages all parts of the VEPP-2000 accelerator facility. Automation software is running on several TCP/IP connected PC platforms under operating system Linux and uses client-server techniques. The paper presents general overview and changes made in architecture, implementation and functionality of hardware and software of the VEPP-2000 collider control system.  
poster icon Poster THPSC27 [7.957 MB]