TUOCKI02 Summary of the RHIC Performance during the FY07 Heavy Ion Run 722
 
  • K. A. Drees, L. Ahrens, J. G. Alessi, M. Bai, D. S. Barton, J. Beebe-Wang, M. Blaskiewicz, J. M. Brennan, K. A. Brown, D. Bruno, J. J. Butler, R. Calaga, P. Cameron, R. Connolly, T. D'Ottavio, W. Fischer, W. Fu, G. Ganetis, J. W. Glenn, M. Harvey, T. Hayes, H.-C. Hseuh, H. Huang, J. Kewisch, R. C. Lee, V. Litvinenko, Y. Luo, W. W. MacKay, G. J. Marr, A. Marusic, R. J. Michnoff, C. Montag, J. Morris, B. Oerter, F. C. Pilat, V. Ptitsyn, T. Roser, J. Sandberg, T. Satogata, C. Schultheiss, F. Severino, K. Smith, S. Tepikian, D. Trbojevic, N. Tsoupas, J. E. Tuozzolo, A. Zaltsman, S. Y. Zhang
    BNL, Upton, Long Island, New York
 
  Funding: Work performed under Contract Number DE-AC02-98CH10886 under the auspices of the US Department of Energy.

After the last successful RHIC Au-Au run in 2004 (Run-4), RHIC experiments now require significantly enhanced luminosity to study very rare events in heavy ion collisions. RHIC has demonstrated its capability to operate routinely above its design average luminosity per store of 2x1026 cm-2 s-1. In Run-4 we already achieved 2.5 times the design luminosity in RHIC. This luminosity was achieved with only 40% of bunches filled, and with β* = 1 m. However, the goal is to reach 4 times the design luminosity, 8x1026 cm-2 s-1, by reducing the beta* value and increasing the number of bunches to the accelerator maximum of 111. In addition, the average time in store should be increased by a factor of 1.1 to about 60% of calendar time. We present an overview of the changes that increased the instantaneous luminosity and luminosity lifetime, raised the reliability, and improved the operational efficiency of RHIC Au-Au operations during Run-7.

 
slides icon Slides  
TUODKI04 Accelerating Polarized Protons to 250 GeV 745
 
  • M. Bai, L. Ahrens, I. G. Alekseev, J. G. Alessi, J. Beebe-Wang, M. Blaskiewicz, A. Bravar, J. M. Brennan, K. A. Brown, D. Bruno, G. Bunce, J. J. Butler, P. Cameron, R. Connolly, T. D'Ottavio, J. DeLong, K. A. Drees, W. Fischer, G. Ganetis, C. J. Gardner, J. W. Glenn, T. Hayes, H.-C. Hseuh, H. Huang, P. F. Ingrassia, J. S. Laster, R. C. Lee, A. U. Luccio, Y. Luo, W. W. MacKay, Y. Makdisi, G. J. Marr, A. Marusic, G. T. McIntyre, R. J. Michnoff, C. Montag, J. Morris, P. Oddo, B. Oerter, J. Piacentino, F. C. Pilat, V. Ptitsyn, T. Roser, T. Satogata, K. Smith, S. Tepikian, D. Trbojevic, N. Tsoupas, J. E. Tuozzolo, M. Wilinski, A. Zaltsman, A. Zelenski, K. Zeno, S. Y. Zhang
    BNL, Upton, Long Island, New York
  • D. Svirida
    ITEP, Moscow
 
  Funding: The work was performed under the US Department of Energy Contract No. DE-AC02-98CH1-886, and with support of RIKEN(Japan) and Renaissance Technologies Corp.(USA)

The Relativistic Heavy Ion Collider~(RHIC) as the first high energy polarized proton collider was designed to provide polarized proton collisions at a maximum beam energy of 250GeV. It has been providing collisions at a beam energy of 100GeV since 2001. Equipped with two full Siberian snakes in each ring, polarization is preserved during the acceleration from injection to 100GeV with careful control of the betatron tunes and the vertical orbit distortions. However, the intrinsic spin resonances beyond 100GeV are about a factor of two stronger than those below 100GeV making it important to examine the impact of these strong intrinsic spin resonances on polarization survival and the tolerance for vertical orbit distortions. Polarized protons were accelerated to the record energy of 250GeV in RHIC with a polarization of 45\% measured at top energy in 2006. The polarization measurement as a function of beam energy also shows some polarization loss around 136GeV, the first strong intrinsic resonance above 100GeV. This paper presents the results and discusses the sensitivity of the polarization survival to orbit distortions.

 
slides icon Slides  
TUXAB02 E-cloud experiments and cures at RHIC 759
 
  • W. Fischer, M. Blaskiewicz, J. M. Brennan, H.-C. Hseuh, H. Huang, V. Ptitsyn, T. Roser, P. Thieberger, D. Trbojevic, J. Wei, S. Y. Zhang
    BNL, Upton, Long Island, New York
  • U. Iriso
    ALBA, Bellaterra (Cerdanyola del Valles)
 
  Funding: Work supported by U. S. DOE under contract No DE-AC02-98CH1-886.

Since 2001 RHIC has experienced electron cloud effects, which have limited the beam intensity. These include dynamic pressure rises – including pressure instabilities, a reduction of the stability threshold for bunches crossing the transition energy, and possibly slow emittance growth. We report on the main observations in operation and dedicated experiments, as well as the effect of various countermeasures including baking, NEG coated warm pipes, pre-pumped cold pipes, bunch patterns, scrubbing, and anti-grazing rings.

 
slides icon Slides  
TUPMS074 Collective Effects in the NSLS-II Storage Ring 1344
 
  • S. Krinsky, J. Bengtsson, J. S. Berg, M. Blaskiewicz, A. Blednykh, W. Guo, N. Malitsky, C. Montag, B. Podobedov, J. Rose, N. A. Towne, L.-H. Yu
    BNL, Upton, Long Island, New York
  • F. Wang
    MIT, Middleton, Massachusetts
 
  Funding: This work was supported by Department of Energy contract DE-AC02-98CH10886.

A new high-brightness synchrotron light source (NSLS-II) is under design at BNL. The 3-GeV NSLS-II storage ring has a double-bend achromatic lattice with damping wigglers installed in zero-dispersion straights to reduce the emittance below 1nm. In this note, we present an overview of the impact of collective effects upon the performance of the storage ring. Subjects discussed include Touschek lifetime, intra-beam scattering, instability thresholds due to ring impedance, and use of a third-harmonic Landau cavity.

 
TUPMS076 Status of R&D Energy Recovery Linac at Brookhaven National Laboratory 1347
 
  • V. Litvinenko, J. Alduino, D. Beavis, I. Ben-Zvi, M. Blaskiewicz, J. M. Brennan, A. Burrill, R. Calaga, P. Cameron, X. Chang, K. A. Drees, G. Ganetis, D. M. Gassner, J. G. Grimes, H. Hahn, L. R. Hammons, A. Hershcovitch, H.-C. Hseuh, A. K. Jain, D. Kayran, J. Kewisch, R. F. Lambiase, D. L. Lederle, C. Longo, G. J. Mahler, G. T. McIntyre, W. Meng, T. C. Nehring, B. Oerter, C. Pai, D. Pate, D. Phillips, E. Pozdeyev, T. Rao, J. Reich, T. Roser, T. Russo, Z. Segalov, J. Smedley, K. Smith, J. E. Tuozzolo, G. Wang, D. Weiss, N. Williams, Q. Wu, K. Yip, A. Zaltsman
    BNL, Upton, Long Island, New York
  • H. Bluem, M. D. Cole, A. J. Favale, D. Holmes, J. Rathke, T. Schultheiss, A. M.M. Todd
    AES, Princeton, New Jersey
  • B. W. Buckley
    CLASSE, Ithaca
  • G. Citver
    Stony Brook University, StonyBrook
  • J. R. Delayen, L. W. Funk, H. L. Phillips, J. P. Preble
    Jefferson Lab, Newport News, Virginia
 
  Funding: Work performed under the auspices of the U. S. Department of Energy and partially funded by the US Department of Defence.

In this paper we present status and plans for the 20-MeV R&D energy recovery linac, which is under construction at Collider Accelerator Department at BNL. The facility is based on high current (up to 0.5 A of average current) super-conducting 2.5 MeV RF gun, single-mode super-conducting 5-cell RF linac and about 20-m long return loop with very flexible lattice. The R&D ERL, which is planned for commissioning in 2008, aims to address many outstanding questions relevant for high current, high brightness energy-recovery linacs.

 
TUPAS094 Transverse Beam Transfer Functions of Colliding Beams in RHIC 1856
 
  • W. Fischer, M. Blaskiewicz, R. Calaga, P. Cameron, Y. Luo
    BNL, Upton, Long Island, New York
  • T. Pieloni
    CERN, Geneva
 
  Funding: Work supported by U. S. DOE under contract No DE-AC02-98CH1-886.

We use transverse beam transfer functions to measure tune distributions of colliding beams in RHIC. The tune has a distribution due to the beam-beam interaction, nonlinear magnetic fields – particularly in the interaction region magnets, and non-zero chromaticity in conjunction with momentum spread. The measured tune distributions are compared with calculations.

 
TUPAS096 Setup and Performance of the RHIC Injector Accelerators for the 2007 Run with Gold Ions 1862
 
  • C. J. Gardner, L. Ahrens, J. G. Alessi, J. Benjamin, M. Blaskiewicz, J. M. Brennan, K. A. Brown, C. Carlson, W. Fischer, J. W. Glenn, M. Harvey, T. Hayes, H. Huang, G. J. Marr, J. Morris, F. C. Pilat, T. Roser, F. Severino, K. Smith, D. Steski, P. Thieberger, N. Tsoupas, A. Zaltsman, K. Zeno
    BNL, Upton, Long Island, New York
 
  Funding: Work performed under the auspices of the US Department of Energy.

Gold ions for the 2007 run of the Relativistic Heavy Ion Collider (RHIC) at Brookhaven National Laboratory (BNL) are accelerated in the Tandem, Booster and AGS prior to injection into RHIC. The setup and performance of this chain of accelerators will be reviewed with a focus on improvements in the quality of beam delivered to RHIC. In particular, more uniform stripping foils between Booster and AGS, and a new bunch merging scheme in AGS promise to provide beam bunches with reduced longitudinal emittance for RHIC.

 
TUPAS099 A Near-Integer Working Point for Polarized Protons in the Relativistic Heavy Ion Collider 1871
 
  • C. Montag, M. Bai, J. Beebe-Wang, M. Blaskiewicz, R. Calaga, W. Fischer, A. K. Jain, Y. Luo, N. Malitsky, T. Roser, S. Tepikian
    BNL, Upton, Long Island, New York
 
  Funding: Work performed under the auspices of the US Department of Energy.

To achieve the RHIC polarized proton enhanced luminosity goal of 150*1030 cm-2 sec-1 on average in stores at 250 GeV, the luminosity needs to be increased by a factor of 3 compared to what was achieved in 2006. Since the number of bunches is already at its maximum of 111, limited by the injection kickers and the experiments' time resolution, the luminosity can only be increased by either increasing the bunch intensity and/or reducing the beam emittance. This leads to a larger beam-beam tuneshift parameter. Operation during 2006 has shown that the beam-beam interaction is already dominating the luminosity lifetime. To overcome this limitation, a near-integer working point is under study. We will present recent results of these studies.

 
WEOCKI03 Status of the R&D Towards Electron Cooling of RHIC 1938
 
  • I. Ben-Zvi, J. Alduino, D. S. Barton, D. Beavis, M. Blaskiewicz, J. M. Brennan, A. Burrill, R. Calaga, P. Cameron, X. Chang, K. A. Drees, A. V. Fedotov, W. Fischer, G. Ganetis, D. M. Gassner, J. G. Grimes, H. Hahn, L. R. Hammons, A. Hershcovitch, H.-C. Hseuh, D. Kayran, J. Kewisch, R. F. Lambiase, D. L. Lederle, V. Litvinenko, C. Longo, W. W. MacKay, G. J. Mahler, G. T. McIntyre, W. Meng, B. Oerter, C. Pai, G. Parzen, D. Pate, D. Phillips, S. R. Plate, E. Pozdeyev, T. Rao, J. Reich, T. Roser, A. G. Ruggiero, T. Russo, C. Schultheiss, Z. Segalov, J. Smedley, K. Smith, T. Tallerico, S. Tepikian, R. Than, R. J. Todd, D. Trbojevic, J. E. Tuozzolo, P. Wanderer, G. Wang, D. Weiss, Q. Wu, K. Yip, A. Zaltsman
    BNL, Upton, Long Island, New York
  • D. T. Abell, G. I. Bell, D. L. Bruhwiler, R. Busby, J. R. Cary, D. A. Dimitrov, P. Messmer, V. H. Ranjbar, D. S. Smithe, A. V. Sobol, P. Stoltz
    Tech-X, Boulder, Colorado
  • A. V. Aleksandrov, D. L. Douglas, Y. W. Kang
    ORNL, Oak Ridge, Tennessee
  • H. Bluem, M. D. Cole, A. J. Favale, D. Holmes, J. Rathke, T. Schultheiss, J. J. Sredniawski, A. M.M. Todd
    AES, Princeton, New Jersey
  • A. V. Burov, S. Nagaitsev, L. R. Prost
    Fermilab, Batavia, Illinois
  • Y. S. Derbenev, P. Kneisel, J. Mammosser, H. L. Phillips, J. P. Preble, C. E. Reece, R. A. Rimmer, J. Saunders, M. Stirbet, H. Wang
    Jefferson Lab, Newport News, Virginia
  • V. V. Parkhomchuk, V. B. Reva
    BINP SB RAS, Novosibirsk
  • A. O. Sidorin, A. V. Smirnov
    JINR, Dubna, Moscow Region
 
  Funding: Work done under the auspices of the US DOE with support from the US DOD.

The physics interest in a luminosity upgrade of RHIC requires the development of a cooling-frontier facility. Detailed cooling calculations have been made to determine the efficacy of electron cooling of the stored RHIC beams. This has been followed by beam dynamics simulations to establish the feasibility of creating the necessary electron beam. Electron cooling of RHIC at collisions requires electron beam energy up to about 54 MeV at an average current of between 50 to 100 mA and a particularly bright electron beam. The accelerator chosen to generate this electron beam is a superconducting Energy Recovery Linac (ERL) with a superconducting RF gun with a laser-photocathode. An intensive experimental R&D program engages the various elements of the accelerator: Photocathodes of novel design, superconducting RF electron gun of a particularly high current and low emittance, a very high-current ERL cavity and a demonstration ERL using these components.

 
slides icon Slides  
WEYC02 Stochastic Cooling of High-Energy Bunched Beams 2014
 
  • M. Blaskiewicz, J. M. Brennan, F. Severino
    BNL, Upton, Long Island, New York
 
  Funding: Work supported by U. S. DOE under contract No DE-AC02-98CH1-886

Stochastic cooling of 100 GeV/nucleon bunched beams has been achieved in the Relativistic Heavy Ion Collider (RHIC). The physics and technology of the longitudinal cooling system are discussed, and plans for a transverse cooling system are outlined.

 
slides icon Slides  
THPMS094 Acceleration of Electrons with the Racetrack Non-Scaling FFAG for e-RHIC 3205
 
  • D. Trbojevic, I. Ben-Zvi, J. S. Berg, M. Blaskiewicz, V. Litvinenko, W. W. MacKay, V. Ptitsyn, T. Roser, A. G. Ruggiero
    BNL, Upton, Long Island, New York
 
  Funding: Supported by the U. S. Department of Energy under Contract No. DE-AC02-98CH10886

Acceleration of electrons up to 10 GeV for a future electron-ion collider eRHIC (Relativistic Heavy Ion Collider) could be performed with the energy recovery linac with multiple passes. An energy recovery scheme is required if a superconducting linac is used for acceleration. We report on an attempt to make a combination of a multi-pass linac with non-scaling Fixed Field Alternating Gradient (NS-FFAG) arcs. Two NS-FFAG arcs would allow electrons to pass through the same structure with different energies. The beam will be accelerated by the superconducting linac at the top of the sine function, and returned to the front of the linac by the non-scaling FFAG. This process is repeated until the total energy of 10 GeV is reached. After collisions the beam is brought back by the NS-FFAG and decelerated before being dumped.

 
THPAS090 A Multipurpose Coherent Instability Simulation Code 3690
 
  • M. Blaskiewicz
    BNL, Upton, Long Island, New York
 
  Funding: Work performed under the United States Department of Energy Contract No. DE-AC02-98CH1-886

A multipurpose coherent instability simulation code has been written, documented, and released for use. TRANFT (tran-eff-tee) uses fast Fourier transforms to model transverse wakefields, transverse detuning wakes and longitudinal wakefields in a computationally efficient way. Dual harmonic RF allows for the study of enhanced synchrotron frequency spread. When coupled with chromaticity, the theoretically challenging but highly practical post head-tail regime is open to study. Detuning wakes allow for transverse space charge forces in low energy hadron beams, and a switch allowing for radiation damping makes the code useful for electrons.

 
THPAS104 Simulations of RHIC Coherent Stabilities Due To Wakefield and Electron Cooling 3726
 
  • G. Wang, M. Blaskiewicz
    BNL, Upton, Long Island, New York
 
  A circulating ion beam in the presence of electron cooling can experience varies instabilities if the electron beam intensity is above a certain threshold. Firstly the electric field generated by the electron beam can introduce two stream instabilities of varies modes; this has already been observed in the Fermilab Recycler ring. Secondly, longitudinal cooling of the momentum spread will reduce the Landau damping efficiency and thus may make the overcooled ion beam unstable. The thresholds and growth rates of varies two stream instability modes are discussed for the existing RHIC electron cooler design. Both simulation and theoretical results are shown for the thresholds of the instabilities caused by overcooling.