RPPT065 Beam Loss Estimates and Control for the BNL Neutrino Facility 3647
 
  • W.-T. Weng, J. Beebe-Wang, Y.Y. Lee, D. Raparia, N. Tsoupas, J. Wei, S.Y. Zhang
    BNL, Upton, Long Island, New York
 
  Funding: This work is performed under the auspices of the US DOE.

BNL plans to upgrade the AGS proton beam from the current 0.14 MW to higher than 1.0 MW for a very long baseline neutrino oscillation experiment. This increase in beam power is mainly due to the faster repetition rate of the AGS by a new 1.5 GeV superconductiong linac as injector, replacing the existing booster. The requirement for low beam loss is very important both to protect the beam component, and to make the hands-on maintenance possible. In this report, the design considerations for achieving high intensity and low loss will be presented. We start by specifying the beam loss limit at every physical process followed by the proper design and parameters for realising the required goals. The process considered in this paper include the emittance growth in the linac, the H- injection, the transition crossing, the ecectron cloud effect, the coherent instabilities, and the extraction losses. Collimation and shielding are also presented.

 
RPPT066 Electromigration Issues in High Current Horn 3700
 
  • W. Zhang, S. Bellavia, J. Sandberg, N. Simos, J.E. Tuozzolo, W.-T. Weng
    BNL, Upton, Long Island, New York
  • B. Hseuh
    JHU, Baltimore, Maryland
 
  Funding: Work performed under the auspices of the U.S. Department of Energy.

The secondary particle focusing horn for the AGS neutrino experiment proposal is a high current and high current density device. The peak current of horn is 300 kA. At the smallest area of horn, the current density is near 8 kA/mm2. At very high current density, a few kA/mm2, the electromigration phenomena will occur. Momentum transfer between electrons and metal atoms at high current density causes electromigration. The reliability and lifetime of focusing horn can be severely reduced by electromigration. In this paper, we discuss issues such as device reliability model, incubation time of electromigration, and lifetime of horn.

 
FPAE050 Injector Linac for the BNL Super Neutrino Beam Project 3129
 
  • D. Raparia, J.G. Alessi, A. Ruggiero, W.-T. Weng
    BNL, Upton, Long Island, New York
 
  Funding: This work was performed under the auspices of the U.S. DOE, Contract No. DE-AC02-98H10886.

BNL plans to upgrade the AGS proton beam from the current 0.14 MW to higher than 1.0 MW and beyond for such a neutrino facility. We have examined possible upgrades to the AGS complex that would meet the requirements of the proton beam for a 1.0 MW neutrino superbeam facility. We are proposing to replace part of the existing 200 MeV linac with coupled cavity structure from 116 MeV to 400 MeV and then add additional 1.1 GeV superconducting linac to reach a final energy of 1.5 GeV for direct H- injection into the AGS. We will present possible choices for the upgrade and our choice and its design.

 
FPAT031 High Energy Pulsed Power System for AGS Super Neutrino Focusing Horn 2191
 
  • W. Zhang, J. Sandberg, W.-T. Weng
    BNL, Upton, Long Island, New York
 
  Funding: Work performed under the auspices of the U.S. Department of Energy.

This paper present a preliminary design of a 300 kA, 2.5 Hz pulsed power system. This system will drive the focusing horn of proposed Brookhaven AGS Neutrino Super Beam Facility for Very Long Baseline Neutrino Oscillation Experiment. The peak output power of the horn pulsed power system will reach giga-watts, and the upgraded AGS will be capable of delivering 1 MW in beam power.