A   B   C   D   E   F   G   H   I   J   K   L   M   N   O   P   Q   R   S   T   U   V   W   X   Y   Z    

Tejima, M.

Paper Title Page
TPPP007 Recent Progress at KEKB 1045
 
  • Y. Funakoshi, K. Akai, K. Ebihara, K. Egawa, A. Enomoto, J.W. Flanagan, H. Fukuma, K.  Furukawa, T. Furuya, J. Haba, S. Hiramatsu, T. Ieiri, N. Iida, H. Ikeda, T. Kageyama, S. Kamada, T. Kamitani, S. Kato, M. Kikuchi, E. Kikutani, H. Koiso, M. Masuzawa, T. Mimashi, A. Morita, T.T. Nakamura, H. Nakayama, Y. Ogawa, K. Ohmi, Y. Ohnishi, N. Ohuchi, K. Oide, M. Ono, M. Shimada, S. Stanic, M. Suetake, Y. Suetsugu, T. Sugimura, T. Suwada, M. Tawada, M. Tejima, M. Tobiyama, N. Tokuda, S. Uehara, S. Uno, N. Yamamoto, Y. Yamamoto, Y. Yano, K. Yokoyama, M. Yoshida, M. Yoshida, S.I. Yoshimoto
    KEK, Ibaraki
  • F. Zimmermann
    CERN, Geneva
 
  We summarize the machine operation of KEKB during past one year. Progress for this period, causes of present performance limitations and future prospects are described.  
RPAE044 Operation and Recent Developments of the Photon Factory Advanced Ring 2845
 
  • T. Miyajima, T. Abe, W.X. Cheng, K. Ebihara, K. Haga, K. Harada, Y. Hori, T. Ieiri, S. Isagawa, T. Kageyama, T. Kasuga, T. Katoh, H. Kawata, M. Kikuchi, Y. Kobayashi, K. Kudo, T. Mitsuhashi, S. Nagahashi, T.T. Nakamura, H. Nakanishi, T. Nogami, T. Obina, Y. Ohsawa, M. Ono, T. Ozaki, H. Sakai, Y. Sakamoto, S. Sakanaka, M. Sato, M. Satoh, T. Shioya, M. Suetake, R. Sugahara, M. Tadano, T. Takahashi, S. Takasaki, Y. Tanimoto, M. Tejima, K. Tsuchiya, T. Uchiyama, A. Ueda, K. Umemori, N. Yamamoto, S. Yamamoto, S.I. Yoshimoto
    KEK, Ibaraki
 
  The Photon Factory Advanced Ring (PF-AR) is a synchrotron light source dedicated to X-ray research. The PF-AR is usually operated at a beam energy of 6.5 GeV, but a 5.0 GeV mode is also available for medical application. In 6.5 GeV mode the typical lifetime of 15 hrs and the beam current of 60 mA with a single-bunch have been archived. Almost full-time single-bunch operation for pulse X-ray characterize the PF-AR. However, single-bunch high-current caused several problems to be solved, including the temperature rise of the some of the vacuum component, a pressure increase in the ring, and a sudden drop in lifetime. In order to avoid these issues the developments of new methods have been continued. In this paper, the status and the recent developments of the PF-AR will be presented. It concerns: the successful operation with two-bunch high-current in 5.0 GeV mode; varying the vertical beam size for the medical application; modulating the RF acceleration phase in order to elongate the length of bunch; stabilizing temperature in the ring tunnel; the study for medium emittance operation with 160 nmrad; moving the RF cavities in order to install a new insertion device; an innovative injection scheme using a pulsed quadrupole magnet.  
RPAT053 Movement of BPMs Due to Thermal Stress in KEKB 3253
 
  • M. Tejima, A. Arinaga, H. Fukuma, S. Hiramatsu, T. Ieiri, I. Ishii, M. Tobiyama
    KEK, Ibaraki
 
  Movement of Beam Position Monitors (BPM) due to thermal stress in high beam current operation is observed in KEKB. For high luminosity operation of KEKB, the beam current as high as 1.6A is accumulated in the positron ring and a precise control of the beam orbit based on the BPM system is required. Though the every BPM chamber is fixed firmly on a support of each quadrupole magnet, the BPM chamber moves several hundred microns from the setting position depending on the beam current due to beam pipe heating by strong synchrotron light irradiation. Such movement introduces an unavoidable offset error in the BPM measurement, and is a serious problem not only for KEKB but also for the next generation of B-factory operated with extremely high beam current. We report the measurement of the movement by distance sensors and an attempt to correct the BPM offset error in real-time operation.