TPPT090 Progress of 2-Cell Cavity Fabrication for Cornell ERL Injector 4248
 
  • R.L. Geng, P. Barnes, M. Liepe, V. Medjidzade, H. Padamsee, A.K. Seaman, J. Sears, V.D. Shemelin, N. Sherwood
    Cornell University, Laboratory for Elementary-Particle Physics, Ithaca, New York
 
  Five 1300 MHz superconducting niobium cavities are to be used for the injector of Cornell ERL. The beam power requirement (100 kW each cavity) and the need to minimize emittance dilution due to the cavity structure have important impacts to the design and fabrication of these cavities. We plan to use Conflat stainless-steel flanges brazed to niobium tubes of niobium cavities. The first copper prototy cavity has been built and measured. Most parts for the first niobium cavity have been manufactured also. In this report, we will present the progress of the prototyping copper as well as niobium cavities.  
TPPT089 Commissioning and Operations Results of the Industry-Produced CESR-Type SRF Cryomodules 4233
 
  • S.A. Belomestnykh, R.P.K. Kaplan, H. Padamsee, P. Quigley, J.J.R. Reilly, J. Sears, V. Veshcherevich
    Cornell University, Laboratory for Elementary-Particle Physics, Ithaca, New York
  • S. Bauer, M. Pekeler, H. Vogel
    ACCEL, Bergisch Gladbach
  • L.-H. Chang, C.-T. Chen, F.-Z. Hsiao, M.-C. Lin, G.-H. Luo, C. Wang, T.-T. Yang, M.-S. Yeh
    NSRRC, Hsinchu
  • E. Matias, J. Stampe, M.S. de Jong
    CLS, Saskatoon, Saskatchewan
 
  Funding: Work is partially supported by the National Science Foundation.

Upon signing a technology transfer agreement with Cornell University, ACCEL began producing turn-key 500 MHz superconducting cavity systems. Four such cryomodules have been delivered, commissioned and installed in accelerators for operation to date. Two more cryomodules are scheduled for testing in early 2005. One of them will be put in operation at Canadian Light Source (CLS); the other will serve as a spare at Taiwan Light Source (TLS). The commissioning results and operational experience with the cryomodules in CESR, CLS and TLS are presented.