A   B   C   D   E   F   G   H   I   J   K   L   M   N   O   P   Q   R   S   T   U   V   W   X   Y   Z    

Pellico, W.

Paper Title Page
MPPT010 A New Correction Magnet Package for the Fermilab Booster Synchrotron 1204
 
  • V.S. Kashikhin, D.J. Harding, J.A. John, J.R. Lackey, A. Makarov, W. Pellico, E. Prebys
    Fermilab, Batavia, Illinois
 
  Funding: Work supported by the U.S. Department of Energy under Contract No. DE-AC02-76CH03000.

Since its initial operation over 30 years ago, most correction magnets in the Fermilab Booster Synchrotron have only been able to fully correct the orbit, tunes, coupling, and chromaticity at injection (400MeV). We have designed a new correction package, including horizontal and vertical dipoles, normal and skew quadrupoles, and normal and skew sextupoles, to provide control up to the extraction energy (8GeV). In addition to tracking the 15Hz cycle of the main, combined function magnets, the quadrupoles and sextupoles must swing through their full range in 1ms during transition crossing. The magnet is made from 12 water-cooled racetrack coils and an iron core with 12 poles, dramatically reducing the effective magnet air gap and increasing the corrector efficiency. Magnetic field analyses of different combinations of multipoles are included.

 
FPAE019 Booster 6-GeV Study 1637
 
  • X. Yang, C.M. Ankenbrandt, J.R. Lackey, R.D. Padilla, W. Pellico
    Fermilab, Batavia, Illinois
  • J. Norem
    ANL, Argonne, Illinois
 
  Funding: Fermi National Accelerator Laboratory, Accelerator Division, Proton Source Department.

Since a wider aperture has been obtained along the Fermilab Booster beam line, this opens the opportunity for Booster running a higher intensity proton beam than ever before. Sooner or later, the available RF accelerating voltage will become a new limit for the beam intensity. Either by increasing the RF accelerating voltage or by reducing the accelerating rate can achieve the similar goal. The motivation for the 6-GeV study is to gain the relative accelerating voltage via a slower acceleration.

 
FPAE022 Cycle-to-Cycle Extraction Synchronization of the Fermilab Booster for Multiple Batch Injection to the Main Injector 1802
 
  • R.M. Zwaska, S.E. Kopp
    The University of Texas at Austin, Austin, Texas
  • W. Pellico
    Fermilab, Batavia, Illinois
 
  We report on a system to ensure cycle-to-cycle synchronization of beam extraction from the Fermilab Booster accelerator to the Main Injector. Such synchronization is necessary for multiple batch operation of the Main Injector for the Run II upgrade of anti-proton production using slip-stacking in the Main Injector, and for the NuMI (Neutrinos at the Main Injector) neutrino beam. To perform this task, a system of fast measurement and feedback is used to control the longitudinal progress of the Booster beam throughout its acceleration period by manipulation of the transverse position maintained by the low-level radio frequency system.