A   B   C   D   E   F   G   H   I   J   K   L   M   N   O   P   Q   R   S   T   U   V   W   X   Y   Z    

Carlson, C.

Paper Title Page
ROAB001 DARHT-II Long-Pulse Beam-Dynamics Experiments 19
 
  • C. Ekdahl, E.O. Abeyta, R. Bartsch, L. Caudill, K.-C.D. Chan, D. Dalmas, S. Eversole, R.J. Gallegos, J. Harrison, M. Holzscheiter, E. Jacquez, J. Johnson, B.T. McCuistian, N. Montoya, S. Nath, K. Nielsen, D. Oro, L. Rodriguez, P. Rodriguez, L.J. Rowton, M. Sanchez, R. Scarpetti, M. Schauer, D. Simmons, H.V. Smith, J. Studebaker, G. Sullivan, C. Swinney, R. Temple
    LANL, Los Alamos, New Mexico
  • H. Bender, W. Broste, C. Carlson, G. Durtschi, D. Frayer, D. Johnson, K. Jones, A. Meidinger, K.J. Moy, R. Sturgess, A. Tipton, C.-Y. Tom
    Bechtel Nevada, Los Alamos, New Mexico
  • R.J. Briggs
    SAIC, Alamo, California
  • Y.-J. Chen, T.L. Houck
    LLNL, Livermore, California
  • S. Eylon, W.M. Fawley, E. Henestroza, S. Yu
    LBNL, Berkeley, California
  • T.P. Hughes, C. Mostrom, Y. Tang
    ATK-MR, Albuquerque, New Mexico
  • M.E. Schulze
    GA, San Diego, California
 
  Funding: This work was supported by the U.S. National Nuclear Security Agency and the U.S. Department of Energy under contract W-7405-ENG-36.

When completed, the DARHT-II linear induction accelerator (LIA) will produce a 2-kA, 18-MeV electron beam with more than 1500-ns current/energy "flat-top." In initial tests DARHT-II has already accelerated beams with current pulse lengths from 500-ns to 1200-ns full-width at half maximum (FWHM) with more than1.2-kA, 12.5-MeV peak current and energy. Experiments are now underway with a ~2000-ns pulse length, but reduced current and energy. These pulse lengths are all significantly longer than any other multi-MeV LIA, and they define a novel regime for high-current beam dynamics, especially with regard to beam stability. Although the initial tests demonstrated absence of BBU, the pulse lengths were too short to test the predicted protection against ion-hose instability. The present experiments are designed to resolve these and other beam-dynamics issues with a ~2000-ns pulse length beam.

 
FPAE029 Setup and Performance of the RHIC Injector Accelerators for the 2005 Run with Copper Ions 2068
 
  • C.J. Gardner, L. Ahrens, J.G. Alessi, J. Benjamin, M. Blaskiewicz, J.M. Brennan, K.A. Brown, C. Carlson, J. DeLong, J. Glenn, T. Hayes, W.W. MacKay, G.J. Marr, J. Morris, T. Roser, F. Severino, K. Smith, D. Steski, N. Tsoupas, A. Zaltsman, K. Zeno
    BNL, Upton, Long Island, New York
 
  Funding: Work performed under the auspices of the U.S. Department of Energy.

Copper ions for the 2005 run of the Relativistic Heavy Ion Collider (RHIC) at Brookhaven National Laboratory are accelerated in the Tandem, Booster and AGS prior to injection into RHIC. The setup and performance of this chain of accelerators will be reviewed.