Keyword: permanent-magnet
Paper Title Other Keywords Page
TUPOB60 Permanent Magnets for High Energy Nuclear Physics Accelerators ion, quadrupole, electron, dipole 622
 
  • N. Tsoupas, S.J. Brooks, A.K. Jain, F. Méot, V. Ptitsyn, D. Trbojevic
    BNL, Upton, Long Island, New York, USA
 
  Funding: Work supported by the US Department of Energy
The proposed eRHIC accelerator1 will collide 20 GeV polarized electrons with 250 GeV polarized protons or 100 GeV/n polarized 3He ions or other unpolarized heavy ions. The electron accelerator of the eRHIC will be based on a 1.665 GeV Energy Recovery Linac (ERL) placed in the RHIC tunnel and two Fixed Field Alternating Gradient (FFAG) recirculating rings placed alongside the RHIC accelerator. The electron bunches reach the 20 GeV energy after passing 12 times through the ERL by recirculation in the FFAG rings. The FFAG rings consist of FODO cells comprised of one focusing and one defocusing quadrupoles made of permanent magnet material. Similarly other sections of the electron accelerator will utilize permanent magnets. In this presentation we will discuss details on the design of these magnets and their advantages over the current-excited magnets.
1. <http://arxiv.org/ftp/arxiv/papers/1409/1409.1633.pdf>
 
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-NAPAC2016-TUPOB60  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
THPOA62 Clearing Magnet Design for APS-U ion, storage-ring, electron, vacuum 1228
 
  • M. Abliz, J.H. Grimmer, Y. Jaski, M. Ramanathan, F. Westferro
    ANL, Argonne, Illinois, USA
 
  Abstract Advanced Photon Source is in the process of developing an upgrade of the storage ring. The Upgrade will be converting the current double bend lattice to a multi-bend lattice (MBA). In addition, the storage ring will be operated at 6 GeV and 200 mA with regular swap-out injection to keep the stored beam current constant. The swap-out injection will take place with beamline shutters open. For radiation safety to ensure that no electrons can exit the storage ring, a passive method of protecting the beamline and containing the electrons inside the storage ring tunnel is proposed. A clearing magnet will be located in all beamline front ends inside the storage ring tunnel. This article will discuss the principle, design and mechanical design of the clearing magnet scheme for the APS-Upgrade.  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-NAPAC2016-THPOA62  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)