Keyword: network
Paper Title Other Keywords Page
MOPOB44 Thyratron Replacement ion, operation, klystron, linear-collider 162
 
  • I. Roth, M.P.J. Gaudreau, M.K. Kempkes, M.G. Munderville, R.E. Simpson
    Diversified Technologies, Inc., Bedford, Massachusetts, USA
 
  Funding: *Work supported by US Department of Energy under contract DE-SC0011292
Semiconductor thyristors have long been used as a replacement for thyratrons in low power or long pulse RF systems. To date, however, such thyristor assemblies have not demonstrated the reliability needed for installation in short pulse, high peak power RF stations used with many pulsed electron accelerators. The fast rising current in a thyristor tends to be carried in a small region, rather than across the whole device, and this localized current concentration can cause a short circuit failure. An alternate solid-state device, the insulated-gate bipolar transistor (IGBT), can readily operate at the speed needed for the accelerator, but commercial IGBTs cannot handle the voltage and current required. It is, however, possible to assemble these devices in arrays to reach the required performance levels without sacrificing their inherent speed. Diversified Technologies, Inc. (DTI) has patented and refined the technology required to build these arrays of series-parallel connected switches. DTI is currently developing an affordable, reliable, form-fit-function replacement for the klystron modulator thyratrons at SLAC capable of pulsing at 360 kV, 420 A, 6μs, and 120 Hz.
 
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-NAPAC2016-MOPOB44  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
TUPOA14 An Internet Rack Monitor-Controller for APS LINAC RF Electronics Upgrade ion, controls, linac, klystron 314
 
  • H. Ma, A. Nassiri, T.L. Smith, Y. Sun
    ANL, Argonne, Illinois, USA
  • L.R. Doolittle, A. Ratti
    LBNL, Berkeley, California, USA
 
  Funding: Work supported by U.S. Department of Energy, Office of Science, Office of Basic Energy Sciences
To support the current research and development in APS LINAC area, the existing LINAC rf control performance needs to be much improved, and thus an upgrade of the legacy LINAC rf electronics becomes necessary. The proposed upgrade plan centers on the concept of using a modern, network-attached, rack-mount digital electronics platform 'Internet Rack Monitor-Controller (or IRMC) to replace the existing analog ones on the legacy crate/backplane-based hardware. The system model of the envisioned IRMC is basically a 3-tier stack with a high-performance processor in the mid- layer to handle the general digital signal processing (DSP). The custom FPGA IP's in the bottom layer handle the high-speed, real-time, low-latency DSP tasks, and provide the interface ports. A network communication gateway, in conjunction with an embedded event receiver (EVR), in the top layer merges the Internet Rack Monitor-Controller device into the networks of the accelerator controls infrastructure. Although the concept is very much in trend with today's Internet-of-Things (IoT), this implementation has actually been used in accelerators for over two decades.
 
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-NAPAC2016-TUPOA14  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
TUPOA51 First Steps Toward Incorporating Image Based Diagnostics into Particle Accelerator Control Systems Using Convolutional Neural Networks ion, gun, controls, solenoid 390
 
  • A.L. Edelen, S. Biedron, S.V. Milton
    CSU, Fort Collins, Colorado, USA
  • J.P. Edelen
    Fermilab, Batavia, Illinois, USA
 
  At present, a variety of image-based diagnostics are used in particle accelerator systems. Often times, these are viewed by a human operator who then makes appropriate adjustments to the machine. Given recent advances in using convolutional neural networks (CNNs) for image processing, it should be possible to use image diagnostics directly in control routines (NN-based or otherwise). This is especially appealing for non-intercepting diagnostics that could run continuously during beam operation. Here, we show results of a first step toward implementing such a controller: our trained CNN can predict multiple simulated downstream beam parameters at the Fermilab Accelerator Science and Technology (FAST) facility's low energy beamline using simulated virtual cathode laser images, gun phases, and solenoid strengths.  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-NAPAC2016-TUPOA51  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)