MOPOB55 Room Temperature Magnets in FRIB Driver Linac 188
 
  • Y. Yamazaki, N.K. Bultman, E.E. Burkhardt, F. Feyzi, K. Holland, A. Hussain, M. Ikegami, F. Marti, S.J. Miller, T. Russo, J. Wei, Q. Zhao
    FRIB, East Lansing, USA
  • W.J. Yang, Q.G. Yao
    IMP/CAS, Lanzhou, People's Republic of China
 
  Funding: Work supported by the U.S. Department of Energy Office of Science under Cooperative Agreement DE-SC0000661 and the National Science Foundation under Cooperative Agreement PHY-1102511.
The FRIB Driver Linac* is to accelerate all the stable ions beyond 200 MeV/nucleon with a beam power of 400 kW. The linac is unique, being compactly folded twice. In this report, the room temperature magnets, amounting 147 in total, after Front End with a 0.5-MeV RFQ, are detailed, emphasizing the rotating coil field measurements and fiducialization.
*E. Pozdeyev et al., "Status of FRIB" in this conference.
T. Xu, "Superconducting Cryomodule Development and Production for the FRIB Linac" in this conference.
 
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-NAPAC2016-MOPOB55  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
TUA1IO01
Status of FRIB  
 
  • G. Pozdeyev, M. Ikegami, J. Wei
    FRIB, East Lansing, USA
 
  The Facility for Rare Isotope Beams (FRIB) is based on a continuous-wave superconducting heavy ion linac to accelerate all the stable isotopes to above 200 MeV/u. The anticipated beam power is 400 kW, being approximately two-to-three orders of magnitude higher than those of operating heavy-ion facilities. The FRIB Project entered into full construction phase recently. This report summarizes the current design and construction status.  
slides icon Slides TUA1IO01 [15.160 MB]  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
WEB3IO01 SRF Devlopment and Cryomodule Production for the FRIB Linac 847
 
  • T. Xu, H. Ao, B. Bird, N.K. Bultman, E.E. Burkhardt, F. Casagrande, C. Compton, J.L. Crisp, K.D. Davidson, K. Elliott, A. Facco, V. Ganni, A. Ganshyn, P.E. Gibson, W. Hartung, M. Ikegami, P. Knudsen, S.M. Lidia, I.M. Malloch, S.J. Miller, D.G. Morris, P.N. Ostroumov, J.T. Popielarski, L. Popielarski, M.A. Reaume, K. Saito, G. Shen, M. Shuptar, S. Stark, J. Wei, J.D. Wenstrom, M. Xu, T. Xu, Y. Xu, Y. Yamazaki, Z. Zheng
    FRIB, East Lansing, USA
  • A. Facco
    INFN/LNL, Legnaro (PD), Italy
  • K. Hosoyama
    KEK, Ibaraki, Japan
  • M.P. Kelly
    ANL, Argonne, Illinois, USA
  • R.E. Laxdal
    TRIUMF, Vancouver, Canada
  • M. Wiseman
    JLab, Newport News, Virginia, USA
 
  Funding: Work supported by the U.S. Department of Energy Office of Sci-ence under Cooperative Agreement DE-SC0000661
The Facility for Rare Isotope Beams' heavy ion con-tinuous-wave (CW) linac extends superconducting RF to low beam energy of 500 keV/u. 332 low-beta cavities are housed in 48 cryomodules. Technical development of high performance subsystems including resonator, cou-pler, tuner, mechanical damper, solenoid and magnetic shielding is necessary. In 2015, the first innovatively designed FRIB bottom-up prototype cryomodule was tested meeting all FRIB specifications. In 2016, the first full production cryomodule is constructed and tested. The preproduction and production cryomodule procurements and in-house assembly are progressing according to the project plan.
 
slides icon Slides WEB3IO01 [15.765 MB]  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-NAPAC2016-WEB3IO01  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)