Author: Abliz, M.
Paper Title Page
THPOA62 Clearing Magnet Design for APS-U 1228
 
  • M. Abliz, J.H. Grimmer, Y. Jaski, M. Ramanathan, F. Westferro
    ANL, Argonne, Illinois, USA
 
  Abstract Advanced Photon Source is in the process of developing an upgrade of the storage ring. The Upgrade will be converting the current double bend lattice to a multi-bend lattice (MBA). In addition, the storage ring will be operated at 6 GeV and 200 mA with regular swap-out injection to keep the stored beam current constant. The swap-out injection will take place with beamline shutters open. For radiation safety to ensure that no electrons can exit the storage ring, a passive method of protecting the beamline and containing the electrons inside the storage ring tunnel is proposed. A clearing magnet will be located in all beamline front ends inside the storage ring tunnel. This article will discuss the principle, design and mechanical design of the clearing magnet scheme for the APS-Upgrade.  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-NAPAC2016-THPOA62  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
THPOA63 Septum Magnet Design for APS-U 1231
 
  • M. Abliz, M. Borland, H. Cease, G. Decker, M.S. Jaski, J.S. Kerby, U. Wienands, A. Xiao
    ANL, Argonne, Illinois, USA
 
  Funding: * Work supported by the U. S. Department of Energy, Office of Science, under Contract No. DE AC02 06CH11357
The Advanced Photon Source is in the process of developing an upgrade (APS-U) of the storage ring from a double-bend to a multi-bend lattice. A swap-out injection is planned for the APS-U lattice to keep a constant beam current and accommodate small, dynamic aperture. A septum magnet that has a minimum thickness of 2 mm with an injection field of 1.06 T has been designed. The stored beam chamber has an 8 mm x 6 mm super-ellipsoidal aperture. The required total deflecting angle is 89 mrad with a ring energy of 6 GeV. The magnet is straight, but is tilted in yaw, roll, and pitch from the stored beam chamber in order to meet the swap out injection requirements for the APS-U lattice. In order to minimize the leakage field inside the stored beam chamber, four different techniques were utilized in the design. As a result, the horizontal deflecting angle of the stored beam was held to only 5 μrad, and the integrated skew quadrupole inside the stored beam chamber was held to 0.09 T. The detailed techniques that were applied to the design, the field multipoles, and the resulting trajectories of the injected and stored beams are reported.
 
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-NAPAC2016-THPOA63  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)