Paper |
Title |
Page |
WEPPP047 |
Installation Process Experiment of HEPS Storage Ring Equipment |
222 |
|
- C.H. Li, F.S. Chen, S.Y. Chen, L. Dong, G. Feng, S. Lu, Z.H. Wang, L. Wu, Y.F. Wu, Y.D. Xu, M. Yang, S. Yang
IHEP, Beijing, People’s Republic of China
|
|
|
HEPS is a new generation synchrotron radiation source under construction in China. In order to complete high-precision installation of the 1.4km storage ring within a limited construction period, it is necessary to identify and solve potential issues in various aspects, including opera-tion space, installation process, alignment scheme, and unit transportation, prior to the regular batch installation. Therefore, a full-process installation experiment was performed and the feasibility of relevant schemes are verified. Batch installation is currently in progress based on the experimental experience.
|
|
|
Poster WEPPP047 [0.874 MB]
|
|
DOI • |
reference for this paper
※ doi:10.18429/JACoW-MEDSI2023-WEPPP047
|
|
About • |
Received ※ 20 October 2023 — Revised ※ 05 November 2023 — Accepted ※ 08 November 2023 — Issued ※ 23 March 2024 |
Cite • |
reference for this paper using
※ BibTeX,
※ LaTeX,
※ Text/Word,
※ RIS,
※ EndNote (xml)
|
|
|