Author: Popielarski, J.T.
Paper Title Page
MO1A01 The FRIB Superconducting Linac - Status and Plans 1
 
  • J. Wei, H. Ao, S. Beher, N.K. Bultman, F. Casagrande, C. Compton, L.R. Dalesio, K.D. Davidson, A. Facco, F. Feyzi, V. Ganni, A. Ganshyn, P.E. Gibson, T. Glasmacher, W. Hartung, L. Hodges, L.T. Hoff, H.-C. Hseuh, A. Hussain, M. Ikegami, S. Jones, K. Kranz, R.E. Laxdal, S.M. Lidia, G. Machicoane, F. Marti, S.J. Miller, D.G. Morris, A.C. Morton, J.A. Nolen, P.N. Ostroumov, J.T. Popielarski, L. Popielarski, G. Pozdeyev, T. Russo, K. Saito, G. Shen, S. Stanley, H. Tatsumoto, T. Xu, Y. Yamazaki
    FRIB, East Lansing, USA
  • K. Dixon, M. Wiseman
    JLab, Newport News, Virginia, USA
  • A. Facco
    INFN/LNL, Legnaro (PD), Italy
  • K. Hosoyama
    KEK, Ibaraki, Japan
  • H.-C. Hseuh
    BNL, Upton, Long Island, New York, USA
  • M.P. Kelly, J.A. Nolen
    ANL, Argonne, Illinois, USA
  • R.E. Laxdal
    TRIUMF, Vancouver, Canada
 
  With an average beam power two orders of magnitude higher than operating heavy-ion facilities, the Facility for Rare Isotope Beams (FRIB) stands at the power frontier of the accelerator family. This report summarizes the current design and construction status as well as plans for commissioning, operations and upgrades.
Work supported by the U.S. Department of Energy Office of Science under Cooperative Agreement DE-SC0000661 and the National Science Foundation under Cooperative Agreement PHY-1102511.
 
slides icon Slides MO1A01 [48.813 MB]  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-LINAC2016-MO1A01  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
TUPLR029 FRIB HWR Tuner Development 535
 
  • S. Stark, A. Facco, S.J. Miller, P.N. Ostroumov, J.T. Popielarski, K. Saito, B.P. Tousignant, T. Xu
    FRIB, East Lansing, Michigan, USA
  • A. Facco
    INFN/LNL, Legnaro (PD), Italy
  • S.M. Gerbick, M.P. Kelly
    ANL, Argonne, USA
 
  Funding: * This material is based upon work supported by the U.S. Department of Energy Office of Science under Cooperative Agreement DE-SC0000661, the State of Michigan and Michigan State University
During the last two years the HWR pneumatic tuner development at FRIB evolved from the first prototypes to the final production design. A lot of warm testing and several cryogenic integrated tests with cavity were performed to optimize the tuner features. The main challenges included the bellow bushings binding and very tight space limitations for the assembly on the rail. The final design, based on the acquired experience, was prepared in collaboration with ANL and entered the preproduction phase.
 
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-LINAC2016-TUPLR029  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
TUPLR030 First FRIB β=0.53 Prototype Coldmasss Build 538
 
  • D.R. Victory, K. Elliott, B. Oja, J.T. Popielarski, M.S. Wilbur
    FRIB, East Lansing, USA
 
  Funding: This material is based upon work supported by the U.S. Department of Energy Office of Science under Cooperative Agreement DE SC0000661, the State of Michigan and Michigan State University.
The β=0.53 coldmass consists of eight Superconducting Radio Frequency (SRF) β=0.53 cavities, eight Fundamental mode Power Couplers (FPC), and one 8 T solenoid. This is the first coldmass with this version of cavity and it has brought new challenges to overcome. The Facility for Rare Isotope Beams (FRIB) contains 18 cryomodules with β=0.53 cavity coldmasses, and this type of coldmass is the highest power and most produced ones in FRIB. During the final cleaning stage and the cavity assembly, particle detection equipment is used to verify the cavity cleanliness levels for cavity certification test and for coldmass assembly. This method allows for cleanliness detection of specific areas inside the cavity at any time a vacuum flange is off. The fixtures, techniques and procedures used to build the β=0.53 coldmasses will be presented.
 
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-LINAC2016-TUPLR030  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
TUPLR033 First FRIB β=0.041 Production Coldmass Build 541
 
  • K. Elliott, S.J. Miller, B. Oja, J.T. Popielarski, L. Popielarski, D.R. Victory, M.S. Wilbur, T. Xu
    FRIB, East Lansing, Michigan, USA
  • M. Wiseman
    JLab, Newport News, Virginia, USA
 
  Funding: This material is based upon work supported by the U.S. Department of Energy Office of Science under Cooperative Agreement DE SC0000661, the State of Michigan and Michigan State University.
Three β=0.041 cryomodules are required for the Facility for Rare Isotope Beams (FRIB) accelerator. Cleanroom assembly of all three coldmasses for these cryomodules has been completed. The cleanroom assembly includes; the superconducting radio frequency (SRF) cavities, the superconducting solenoids, fundamental power couplers (FPC), beam position monitors, alignment rail, and transport cart. This paper will provide an overview of the techniques and procedures used to assemble this cavity string such that it can be used in the FRIB accelerator.
 
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-LINAC2016-TUPLR033  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
TUPLR067 Solenoid/Magnetic Shielding Test Results in FRIB-1&2 Cryomodules 607
SPWR006   use link to see paper's listing under its alternate paper code  
 
  • D. Luo, H. Ao, E.E. Burkhardt, J. Casteel, A. Ganshyn, W. Hartung, M.J. Holcomb, J.T. Popielarski, K. Saito, S. Shanab, E. Supangco, M. Thrush
    FRIB, East Lansing, Michigan, USA
 
  Funding: This material is based upon work supported by the U.S. Department of Energy Office of Science under Cooperative Agreement DE-SC0000661, the State of Michigan and Michigan State University.
Recently we did bunker tests for FRIB first cryomodule (CM-1) and second one (CM-2) which houses 0.085 QWRs and solenoid packages. Their performances were successfully validated in the full configuration. This paper reports the solenoid package tests results.
 
poster icon Poster TUPLR067 [4.899 MB]  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-LINAC2016-TUPLR067  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
WE2A02 FRIB Cryomodule Design and Production 673
 
  • T. Xu, H. Ao, B. Bird, N.K. Bultman, E.E. Burkhardt, F. Casagrande, C. Compton, J.L. Crisp, K.D. Davidson, K. Elliott, A. Facco, V. Ganni, A. Ganshyn, W. Hartung, M. Ikegami, P. Knudsen, S.M. Lidia, I.M. Malloch, S.J. Miller, D.G. Morris, P.N. Ostroumov, J.T. Popielarski, L. Popielarski, M.A. Reaume, K. Saito, S. Shanab, G. Shen, M. Shuptar, S. Stark, J. Wei, J.D. Wenstrom, M. Xu, Y. Xu, Y. Yamazaki, Z. Zheng
    FRIB, East Lansing, USA
  • A. Facco
    INFN/LNL, Legnaro (PD), Italy
  • K. Hosoyama
    KEK, Ibaraki, Japan
  • M.P. Kelly
    ANL, Argonne, Illinois, USA
  • R.E. Laxdal
    TRIUMF, Vancouver, Canada
  • M. Wiseman
    JLab, Newport News, Virginia, USA
 
  Funding: U.S. Department of Energy Office of Science under Cooperative Agreement DE-SC0000661
The Facility for Rare Isotope Beams (FRIB), under con-struction at Michigan State University, will utilize a driver linac to accelerate stable ion beams from protons to ura-nium up to energies of >200 MeV per nucleon with a beam power of up to 400 kW. Superconducting technology is widely used in the FRIB project, including the ion sources, linac, and experiment facilities. The FRIB linac consists of 48 cryomodules containing a total of 332 superconducting radio-frequency (SRF) resonators and 69 superconducting solenoids. We report on the design and the construction of FRIB cryomodules.
 
slides icon Slides WE2A02 [3.823 MB]  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-LINAC2016-WE2A02  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
THOP10 Design and Commissioning of FRIB Multipacting-Free Fundamental Power Coupler 767
THPLR010   use link to see paper's listing under its alternate paper code  
 
  • Z. Zheng, J.T. Popielarski, K. Saito, S. Stark, T. Xu, Y. Yamazaki
    FRIB, East Lansing, USA
 
  Funding: *Work supported by the U.S. Department of Energy Office of Science under Cooperative Agreement DE-SC0000661
The original Fundamental Power Coupler (FPC) of Half-Wave Resonator (HWR) for the Facility of Rare Isotope Beams (FRIB) requires multipacting conditioning at operating RF power which is up to 5 kW Continue Wave (CW). Conditioning takes a lot of time and RF power, and its elimination is highly desirable. To significantly shorten the RF conditioning, we developed a multipacting-free coupler design. This paper reports the latest progress in the optimization and prototype tests of multipacting-free coupler. The choke structure is removed and coupler geometry is further modified to protect the coupler RF window from the electron bombardment. The comparison result of multipacting-free coupler with original coupler was performed on automatic conditioning system, which showed significantly time reducing for RF conditioning.
 
slides icon Slides THOP10 [2.442 MB]  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-LINAC2016-THOP10  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
THPRC013 Design of a FRIB Half-Wave Pre-Production Cryomodule 795
 
  • S.J. Miller, H. Ao, B. Bird, G.D. Bryant, B. Bullock, N.K. Bultman, F. Casagrande, C. Compton, A. Facco, W. Hartung, J.D. Hulbert, D.G. Morris, P.N. Ostroumov, J.T. Popielarski, L. Popielarski, M.A. Reaume, K. Saito, M. Shuptar, J. Simon, S. Stark, B.P. Tousignant, J. Wei, J.D. Wenstrom, K. Witgen, T. Xu, Z. Zheng
    FRIB, East Lansing, USA
  • A. Facco
    INFN/LNL, Legnaro (PD), Italy
  • M.P. Kelly
    ANL, Argonne, Illinois, USA
 
  Funding: This material is based upon work supported by the U.S. Department of Energy Office of Science under Cooperative Agreement DE SC0000661.
The driver linac for the Facility for Rare Isotope Beams (FRIB) will require the production of 48 cryomodules (CMs). In addition to the β=0.085 quarter-wave CM, FRIB has completed the design of a β=0.53 half-wave CM as a pre-production prototype. This CM will qualify the performance of the resonators, fundamental power couplers, tuners, and cryogenic systems of the β=0.53 half-wave design. In addition to the successful systems qualification; the β=0.53 CM build will also verify the FRIB bottom up assembly and alignment method on a half-wave CM type. The lessons learned from the β=0.085 pre-production CM build including valuable fabrication, sourcing, and assembly experience have been applied to the design of β=0.53 half-wave CM. This paper will report the design of the β=0.53 half-wave CM as well as the CM interfaces within the linac tunnel.
 
poster icon Poster THPRC013 [0.954 MB]  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-LINAC2016-THPRC013  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
THPRC021 Status of β=0.53 Pre-Production Cryomodule 811
 
  • H. Ao, B. Bird, G.D. Bryant, B. Bullock, N.K. Bultman, C. Compton, A. Facco, J.D. Hulbert, S.J. Miller, J.T. Popielarski, L. Popielarski, M.A. Reaume, K. Saito, M. Shuptar, J. Simon, S. Stark, B.P. Tousignant, J.D. Wenstrom, K. Witgen, T. Xu, Z. Zheng
    FRIB, East Lansing, USA
 
  Funding: This material is based upon work supported by the U.S. Department of Energy Office of Science under Cooperative Agreement DE SC0000661.
The driver linac for the Facility for Rare Isotope Beams (FRIB) comprises four kinds of cavities (=0.041, 0.085, 0.29, and 0.53) and six types of cryomodules including matching modules. FRIB has started the fabrication of a β=0.53 preproduction cryomodule, which is the first prototype for a half-wave (=0.29 and 0.53) cavity. This paper describes the fabrication progress and the lessons learned from the β=0.53 preproduction cryomodule.
 
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-LINAC2016-THPRC021  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
THPRC023 Cost Reduction for FRIB Magnetic Shielding 818
 
  • Z. Zheng, J.T. Popielarski, K. Saito, T. Xu
    FRIB, East Lansing, Michigan, USA
 
  Funding: *Work supported by the U.S. Department of Energy Office of Science under Cooperative Agreement DE-SC0000661
Cryogenic magnetic shielding (A4K) is generally used in SRF cryomodules which is much more expensive than mu-metal used in room temperature. In order to reduce the cost, FRIB QWR and HWR magnetic shieldings were redesign to improve the shielding performance so that mu-metal can be implemented as an alternative shielding material. The magnetic shielding of first FRIB β=0.085 cryomodule was made up of 50% by A4K and 50% by mu-metal. Cavities were tested in 4K and 2K, the results showed that the Q0 of cavities were similar for both shielding materials, which is a success as a validation test for mu-metal magnetic shielding.
 
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-LINAC2016-THPRC023  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)