Paper |
Title |
Page |
MOOP01 |
The SARAF-LINAC Project Status |
38 |
MOPLR075 |
|
|
- N. Pichoff, B. Gastineau, P. Girardot
CEA/DSM/IRFU, France
- N. Bazin, D. Chirpaz-Cerbat, B. Dalena, G. Ferrand, P. Gastinel, F. Gougnaud, M. Jacquemet, C. Madec, P.A.P. Nghiem, D. Uriot
CEA/IRFU, Gif-sur-Yvette, France
- P. Bertrand, M. Di Giacomo, R. Ferdinand, J.-M. Lagniel
GANIL, Caen, France
|
|
|
SNRC and CEA collaborate to the upgrade of the SARAF accelerator to 5 mA CW 40 MeV deuteron and proton beams (Phase 2). CEA is in charge of the design, construction and commissioning of the superconducting linac (SARAF-LINAC Project). This paper presents to the accelerator community the status at August 2016 of the SARAF-LINAC Project.
|
|
|
Slides MOOP01 [4.978 MB]
|
|
DOI • |
reference for this paper
※ https://doi.org/10.18429/JACoW-LINAC2016-MOOP01
|
|
Export • |
reference for this paper using
※ BibTeX,
※ LaTeX,
※ Text/Word,
※ RIS,
※ EndNote (xml)
|
|
|
WE1A06 |
Status of SPIRAL2 and RFQ Beam Commissioning |
668 |
|
- R. Ferdinand, P. Bertrand, M. Di Giacomo, H. Franberg, O. Kamalou, J.-M. Lagniel, G. Normand, A. Savalle, F. Varenne
GANIL, Caen, France
- J.-L. Biarrotte
IPN, Orsay, France
- D. Uriot
CEA/DRF/IRFU, Gif-sur-Yvette, France
|
|
|
The SPIRAL2 project beam commissioning is started and the superconducting linac installation is being finalized. In parallel with the installations, the first proton beam was extracted in 2014 and the expected beam performances were achieved from both light and heavy ion sources. The conditioning of the RFQ started in October 2015, and the beam commissioning soon after that. After having briefly recalled the project scope and parameters, the present situation of the RFQ beam commissioning is presented.
|
|
|
Slides WE1A06 [19.488 MB]
|
|
DOI • |
reference for this paper
※ https://doi.org/10.18429/JACoW-LINAC2016-WE1A06
|
|
Export • |
reference for this paper using
※ BibTeX,
※ LaTeX,
※ Text/Word,
※ RIS,
※ EndNote (xml)
|
|
|