Keyword: site
Paper Title Other Keywords Page
SUPB026 Multipacting Analysis of High-velocity Superconducting Spoke Resonators electron, cavity, simulation, superconductivity 68
 
  • C.S. Hopper, J.R. Delayen
    ODU, Norfolk, Virginia, USA
 
  Some of the advantages of superconducting spoke cavities are currently being investigated for the high-velocity regime. When determining a final, optimized geometry, one must consider the possible limiting effects multipacting could have on the cavity. We report on the results of analytical calculations and numerical simulations of multipacting electrons in superconducting spoke cavities and methods for reducing their impact.  
 
MOPB056 Multipacting Analysis of High-Velocity Superconducting Spoke Resonators electron, cavity, simulation, superconductivity 303
 
  • C.S. Hopper, J.R. Delayen
    ODU, Norfolk, Virginia, USA
 
  Some of the advantages of superconducting spoke cavities are currently being investigated for the high-velocity regime. When determining a final, optimized geometry, one must consider the possible limiting effects multipacting could have on the cavity. We report on the results of analytical calculations and numerical simulations of multipacting electrons in superconducting spoke cavities and methods for reducing their impact.  
 
TU1A05 Status and Commissioning Plan of the PEFP 100-MeV Linear Accelerator linac, DTL, proton, klystron 422
 
  • H.-J. Kwon, Y.-S. Cho, J.-H. Jang, D.I. Kim, H.S. Kim, B.-S. Park, J.Y. Ryu, K.T. Seol, Y.-G. Song, S.P. Yun
    KAERI, Daejon, Republic of Korea
 
  Funding: Works supported by the Ministry of Education, Science and Technology of Korean Government.
One of the goals of the Proton Engineering Frontier Project (PEFP) is to develop a 100 MeV proton linear accelerator, which consists of 50 keV proton injector, 3 MeV radio frequency quadrupole (RFQ), 20 MeV/100 MeV drift tube linac (DTL) and 20 MeV/100 MeV beam lines. The 100 MeV linear accelerator and beam line components have been installed in the tunnel and experimental hall. After the completion of the utility commissioning, the commissioning of the accelerator starts with a goal of the beam delivery to the 100 MeV target room located at the end of the beam line in 2012. In this paper, the status and commissioning plan of the PEFP 100 MeV linear accelerator are presented.
 
slides icon Slides TU1A05 [6.795 MB]