MOPB024 Beam Dynamics Simulation and Optimization for 10 MeV Superconducting e-Linac Injector for VECC-RIB Facility 225
 
  • A. Chakrabarti, S. Dechoudhury, V. Naik
    VECC, Kolkata, India
  • F. Ames, R.A. Baartman, Y.-C. Chao, R.E. Laxdal, M. Marchetto, L. Merminga, F. Yan
    TRIUMF, Vancouver, Canada
  • G. Goh
    SFU, Burnaby, BC, Canada
 
  Funding: This project is funded by Department of Atomic Energy, India
In the first phase of ongoing collaboration between VECC (India) and TRIUMF (Canada) a 10 MeV superconducting electron linac injector will be installed at VECC. This will constitute a 100 keV DC thermionic gun with grid delivering pulsed electron beam at 650 MHz. Owing to low energy from the gun, a capture cryo-module (CCM) consisting of two β = 1 single cell elliptical cavities (frequency = 1.3 GHz) will be inserted before a 9-cell β = 1 elliptical cavity that will provide acceleration to 10 MeV. The present paper depicts the beam dynamics simulation and optimization of different parameters for the injector with a realistic simulated beam emittance from the electron gun.
 
 
WE1A04 The ARIEL Superconducting Electron Linac 729
 
  • S.R. Koscielniak, F. Ames, R.A. Baartman, I.V. Bylinskii, Y.-C. Chao, D. Dale, R.J. Dawson, E.R. Guetre, N. Khan, A. Koveshnikov, A. Laxdal, R.E. Laxdal, F. Mammarella, M. Marchetto, L. Merminga, A.K. Mitra, T. Planche, Y.-N. Rao, A. Sitnikov, V.A. Verzilov, D. Yosifov, V. Zvyagintsev
    TRIUMF, Vancouver, Canada
  • D. Karlen, R.R. Langstaff
    Victoria University, Victoria, B.C., Canada
 
  The TRIUMF Advanced Rare Isotope Laboratory (ARIEL) is funded since 2010 June by federal and BC Provincial governments. In collaboration with the University of Victoria, TRIUMF is proceeding with construction of a new target building, connecting tunnel, rehabilitation of an existing vault to contain the electron linear accelerator, and a cryogenic compressor building. TRIUMF starts construction of a 300 keV thermionic gun, and 10 MeV Injector cryomodule (EINJ) in 2012; the designs being complete. The 25 MeV Accelerator Cryomodule (EACA) follows in autumn 2013. TRIUMF is embarking on major equipment purchases and has signed contracts for 4K cryogenic plant and four sub-atmospheric pumps, a 290 kW c.w. klystron and high-voltage power supply, 80 quadrupole magnets, EINJ tank and lid, and four 1.3 GHz niobium 9-cell cavities from a local Canadian supplier. The low energy beam transport and beam diagnotics are being installed at the ISAC-II/VECC test facility. Procurement is anticipated October 2012 for the liquid He distribution system.  