Author: Van den Broucke, W.
Paper Title Page
WEPAB366 Towards the Last Stages of the CERN’s AD-Target Area Consolidation Project and Recommissioning Plans to Resume Operation 3563
 
  • C. Torregrosa, C. Ahdida, A. Bouvard, A. Broche, S. Burger, M.E.J. Butcher, M. Calviani, V. Clerc, A. De Macedo, S. De Man, F.A. Deslande, M. Di Castro, T. Dobers, T. Feniet, R. Ferriere, E. Fornasiere, R. Franqueira Ximenes, T.J. Giles, J.L. Grenard, E. Grenier-Boley, G. Gräwer, M. Guinchard, M.D. Jedrychowski, K. Kershaw, B. Lefort, E. Lopez Sola, J.M. Martin Ruiz, A. Martínez Sellés, G. Matulenaite, C.Y. Mucher, A. Newborough, M. Perez Ornedo, E. Perez-Duenas, A. Perillo-Marcone, L. Ponce, N. Solieri, M.B. Szewczyk, P.A. Thonet, M.A. Timmins, A. Tursun, W. Van den Broucke, F.M. Velotti, C. Vendeuvre, V. Vlachoudis
    CERN, Meyrin, Switzerland
  • J.C. Espadanal
    LIP, Lisboa, Portugal
 
  An­tipro­tons are pro­duced at CERN at the An­tipro­ton De­cel­er­a­tor (AD) Tar­get Area by im­pact­ing 26 GeV/c pro­ton beams onto a fixed tar­get. Fur­ther col­lec­tion, mo­men­tum se­lec­tion, and trans­port of the sec­ondary par­ti­cles - in­clud­ing an­tipro­tons - to­wards the AD ring is re­alised by a 400 kA pulsed mag­netic horn and a set of mag­netic dipoles and quadrupoles. A major con­sol­i­da­tion of the area - in op­er­a­tion since the 80s - has taken place dur­ing the CERN Long Shut­down 2 (2019-2021). Among other ac­tiv­i­ties, such up­grade in­cluded: (i) In­stal­la­tion of a new air-cooled tar­get de­sign and man­u­fac­tur­ing of a new batch of mag­netic horns, in­clud­ing a sur­face puls­ing test-bench for their val­i­da­tion and fine-tun­ing (ii) In­stal­la­tion of a new po­si­tion­ing and main­te­nance sys­tem for the tar­get and horn (iii) Re­fur­bish­ment and de­con­t­a­m­i­na­tion of the Tar­get Area and its equip­ment, (iv) Con­struc­tion of a new sur­face ser­vice build­ing to house new nu­clear ven­ti­la­tion sys­tems. This con­tri­bu­tion pre­sents an overview of such ac­tiv­i­ties and les­son learnt. In ad­di­tion, it pro­vides the lat­est re­sults from re­frac­tory met­als R&D for the an­tipro­ton tar­get and a sum­mary of the recom­mis­sion­ing and op­ti­miza­tion plans.  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2021-WEPAB366  
About • paper received ※ 18 May 2021       paper accepted ※ 21 June 2021       issue date ※ 01 September 2021  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)