WEPAB361 New Generation CERN LHC Injection Dump - Assembly and Installation (TDIS) 3548
 
  • D. Carbajo Perez, E. Berthomé, C. Bertone, N. Biancacci, C. Bracco, G. Bregliozzi, B. Bulat, C. Cadiou, M. Calviani, G. Cattenoz, A. Cherif, P. Costa Pinto, A. Dallocchio, M. Di Castro, P. Fessia, M.I. Frankl, R. Franqueira Ximenes, J.-F. Fuchs, H. Garcia Gavela, J.-M. Geisser, L. Gentini, S.S. Gilardoni, M.A. Gonzalez De La Aleja Cabana, J.L. Grenard, J.M. Heredia, S. Joly, A. Lechner, J. Lendaro, J. Maestre, E. Page, M. Perez Ornedo, A. Perillo-Marcone, D. Pugnat, E. Rigutto, B. Salvant, A. Sapountzis, K. Scibor, R. Seidenbinder, J. Sola Merino, M. Taborelli, E. Urrutia, A. Vieille, C. Vollinger, C. Yin Vallgren
    CERN, Geneva, Switzerland
 
  Funding: Work supported by the Hilumi Project
During CERN’s LS2, several upgrades were performed to beam intercepting devices in the framework of the HL-LHC Project. Upgraded equipment includes two internal beam dumps (TDIS) intended for machine protection located at the injection points from the SPS to the LHC. These two devices have been assembled, tested, and installed around LHC Point 2 and Point 8 and are currently ready to get commissioned with the beam. They are 5.8m-long, three-module-segmented vacuum chambers, with large aperture to accommodate the injected and circulating beam and equipped with absorbing materials, These comprise graphite and higher Z alloys that are embedded on sub-assemblies reinforced with back-stiffeners made of TZM. The current contribution covers three main matters. First, it details the TDIS design and its key technical features. The second topic discussed is the outcome of an experiment where a prototype module was tested under high-energy beam impacts at CERN’s HiRadMat facility. To conclude it is presented the return of experience from the pre-series construction, validation and installation in the LHC tunnel.
 
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2021-WEPAB361  
About • paper received ※ 18 May 2021       paper accepted ※ 11 June 2021       issue date ※ 17 August 2021  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
WEPAB366 Towards the Last Stages of the CERN’s AD-Target Area Consolidation Project and Recommissioning Plans to Resume Operation 3563
 
  • C. Torregrosa, C. Ahdida, A. Bouvard, A. Broche, S. Burger, M.E.J. Butcher, M. Calviani, V. Clerc, A. De Macedo, S. De Man, F.A. Deslande, M. Di Castro, T. Dobers, T. Feniet, R. Ferriere, E. Fornasiere, R. Franqueira Ximenes, T.J. Giles, J.L. Grenard, E. Grenier-Boley, G. Gräwer, M. Guinchard, M.D. Jedrychowski, K. Kershaw, B. Lefort, E. Lopez Sola, J.M. Martin Ruiz, A. Martínez Sellés, G. Matulenaite, C.Y. Mucher, A. Newborough, M. Perez Ornedo, E. Perez-Duenas, A. Perillo-Marcone, L. Ponce, N. Solieri, M.B. Szewczyk, P.A. Thonet, M.A. Timmins, A. Tursun, W. Van den Broucke, F.M. Velotti, C. Vendeuvre, V. Vlachoudis
    CERN, Meyrin, Switzerland
  • J.C. Espadanal
    LIP, Lisboa, Portugal
 
  Antiprotons are produced at CERN at the Antiproton Decelerator (AD) Target Area by impacting 26 GeV/c proton beams onto a fixed target. Further collection, momentum selection, and transport of the secondary particles - including antiprotons - towards the AD ring is realised by a 400 kA pulsed magnetic horn and a set of magnetic dipoles and quadrupoles. A major consolidation of the area - in operation since the 80s - has taken place during the CERN Long Shutdown 2 (2019-2021). Among other activities, such upgrade included: (i) Installation of a new air-cooled target design and manufacturing of a new batch of magnetic horns, including a surface pulsing test-bench for their validation and fine-tuning (ii) Installation of a new positioning and maintenance system for the target and horn (iii) Refurbishment and decontamination of the Target Area and its equipment, (iv) Construction of a new surface service building to house new nuclear ventilation systems. This contribution presents an overview of such activities and lesson learnt. In addition, it provides the latest results from refractory metals R&D for the antiproton target and a summary of the recommissioning and optimization plans.  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2021-WEPAB366  
About • paper received ※ 18 May 2021       paper accepted ※ 21 June 2021       issue date ※ 01 September 2021  