Author: Harada, K.
Paper Title Page
MOPAB091 Injection Section Upgrading with the Septum-Magnet Replacement in KEK-PF Ring 342
 
  • C. Mitsuda, K. Harada, N. Higashi, T. Honda, Y. Kobayashi, H. Miyauchi, S. Nagahashi, N. Nakamura, T. Nogami, T. Obina, M. Tadano, R. Takai, H. Takaki, Y. Tanimoto, T. Uchiyama, A. Ueda
    KEK, Ibaraki, Japan
 
  In 2015, the water leakage happened at the cooling pipe of the in-vacuum septum magnet installed into the injection point. Because the maintenance of the leakage needed the total replacement of the magnet, the water circulation was stopped permanently, and accordingly, the light absorber was installed upstream in the storage ring to prevent the synchrotron light of the bending magnet from coming to the septum wall. This treatment temporally worked well, but the beam injection efficiency was decreased to about 30% due to the physical aperture narrowed by the absorber. With the desired replacement of septum magnet to maintainable out-vacuum type, the injection section upgrading was simultaneously planned to recover and improve the injection efficiency. In this upgrade, the injection beam is closed to the stored beam more than before by adapting the thinner septum structure as a way to improve the injection efficiency. And some new ideas are introduced in the part of monitor and beam duct, for example, realtime beam monitor, thinner Inconel duct. The detailed design of the upgraded injection section and technical points will be reviewed in this conference.  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2021-MOPAB091  
About • paper received ※ 19 May 2021       paper accepted ※ 26 May 2021       issue date ※ 02 September 2021  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
TUPAB064 Specifications and Performance of a Chicane Magnet for the cERL IR-FEL 1512
 
  • N. Nakamura, K. Harada, N. Higashi, Y. Honda, R. Kato, C. Mitsuda, S. Nagahashi, T. Obina, H. Sakai, M. Shimada, H. Takaki, O.A. Tanaka
    KEK, Ibaraki, Japan
  • Y. Lu
    Sokendai, Ibaraki, Japan
 
  Funding: Work supported by NEDO project "Development of advanced laser processing with intelligence based high-brightness and high-efficiency laser technologies (TACMI project)".
The IR-FEL was constructed in the Compact ERL (cERL) at KEK from October 2019 to May 2020 for the purpose of developing high-power mid-infrared lasers for high-efficiency laser processing utilizing molecular vibrational absorption. The chicane magnet was newly installed between two IR-FEL undulators in the cERL in order to increase the FEL gain and pulse energy by converting the energy modulation to the density modulation in an electron bunch. It consists of three dipole magnets with laminated yokes made of 0.1-mm-thick permalloy sheets and the coil currents of the three magnets are independently controlled by three power supplies with the maximum current of 10 A. The maximum closed orbit bump made by the chicane magnetic field has the longitudinal dispersion(R56) of -6 mm. The coil-current ratio of the three dipole magnets was tuned after installation to make its orbit bumps closed and then the chicane magnet was used in the FEL operation. We present specifications and operational performance of the chicane magnet.
 
poster icon Poster TUPAB064 [4.053 MB]  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2021-TUPAB064  
About • paper received ※ 18 May 2021       paper accepted ※ 25 May 2021       issue date ※ 25 August 2021  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
TUPAB099 Construction of an Infrared FEL at the Compact ERL 1608
 
  • R. Kato, M. Adachi, S. Eguchi, K. Harada, N. Higashi, Y. Honda, T. Miyajima, S. Nagahashi, N. Nakamura, K.N. Nigorikawa, T. Nogami, T. Obina, H. Sagehashi, H. Sakai, M. Shimada, T. Shioya, M. Tadano, R. Takai, O.A. Tanaka, Y. Tanimoto, K. Tsuchiya, T. Uchiyama, A. Ueda, M. Yamamoto
    KEK, Ibaraki, Japan
  • R. Hajima
    QST, Tokai, Japan
  • N.P. Norvell
    SLAC, Menlo Park, California, USA
  • F. Sakamoto
    Akita National College of Technology, Akita, Japan
  • M. Shimada
    HSRC, Higashi-Hiroshima, Japan
 
  Funding: Work supported by NEDO project "Development of advanced laser processing with intelligence based high-brightness and high-efficiency laser technologies (TACMI project)".
The compact Energy Recovery Linac (cERL) has been in operation at KEK since 2013 to demonstrate ERL performance and develop ERL technology. Recently KEK has launched an infrared FEL project with a competitive funding. The purpose of this project is to build a mid-infrared FEL at the cERL, and to use that FEL as a light source for construction of the processing database required for industrial lasers. The FEL system is composed of two 3-m undulators and a matching section between them, and generates light with a maximum pulse energy of 0.1 micro-J at the wavelength of 20 microns with an 81.25 MHz repetition rate. The FEL is also expected to become a proof-of-concept machine for ERL base FELs for future EUV lithography.
 
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2021-TUPAB099  
About • paper received ※ 20 May 2021       paper accepted ※ 14 June 2021       issue date ※ 29 August 2021  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
TUPAB359 Magnetic Field Measurement and Beam Performance Test of Ceramics Chamber with Integrated Pulsed Magnet at KEK-PF 2352
 
  • Y. Lu
    Sokendai, Ibaraki, Japan
  • K. Harada, Y. Kobayashi, C. Mitsuda, S. Nagahashi, T. Nogami, T. Obina, R. Takai, H. Takaki, T. Uchiyama, A. Ueda
    KEK, Ibaraki, Japan
 
  An air-core magnet named Ceramics Chamber with integrated Pulsed Magnet(CCiPM) is being developed at the photon factory of KEK(KEK-PF), which will have several applications for the future light source. One prototype has been developed as a dipole kicker, whose bore is only 30mm. Due to the type and structure, it’s expected to have strong magnetic field and high repetition rate. After finishing the offline measurement of magnetic field and evaluation of vacuum tightness, the CCiPM was installed in the beam transport-dump line of PF to have an online beam performance and durability test. The results of the magnetic field measurement and beam performance test will be reviewed.  
poster icon Poster TUPAB359 [1.164 MB]  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2021-TUPAB359  
About • paper received ※ 19 May 2021       paper accepted ※ 02 June 2021       issue date ※ 16 August 2021  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
WEXC06
Eddy Current Effects on the Stored Beam Generated by the Pulsed Sextupole Magnet at KEK-PF  
 
  • H. Takaki, K. Harada, Y. Kobayashi, C. Mitsuda, T. Nogami, T. Obina, R. Takai, T. Uchiyama
    KEK, Ibaraki, Japan
  • Y. Lu
    Sokendai, Ibaraki, Japan
 
  The Photon Factory (KEK-PF) has been continuously developing new technologies for the top-up injection using the pulsed multipole magnets (PMM). We demonstrated beam injection with the PMM successfully at KEK-PF and operated for synchrotron user experiments with top-up injection in four years. One of the important issues to be solved in this injection is the effect of eddy currents on the stored beam generated in the PMM and its inner coating of the ceramic duct. The magnetic field of the PMM is designed so that it does not affect the stored beam, however, the eddy currents that occurred on the coating give an unwanted kick to the stored beam at the injection. In this paper, we report eddy current effects on the stored beam generated by the pulsed sextupole magnet.  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
FRXB04 Newly Development of Ceramics Chamber with Integrated Pulsed Magnet for Super-Narrow Bore in KEK-PF 4524
 
  • C. Mitsuda, K. Harada, Y. Kobayashi, S. Nagahashi, T. Nogami, T. Obina, R. Takai, H. Takaki, T. Uchiyama, A. Ueda
    KEK, Ibaraki, Japan
  • K. Hamaji, K. Iwamoto, A. Sasagawa, A. Yokoyama
    KYOCERA Corporation, Higashiomi-city, Shiga, Japan
  • Y. Lu
    Sokendai, Ibaraki, Japan
 
  Ceramics chamber with integrated pulsed magnet (CCiPM) is a new air-core type magnet that has a plan to be used as a multipole injection magnet, a dipole injection kicker, and a fast correction kicker in the next-generation light source. The magnet coils are implanted completely into the thickness of cylindrical ceramic and integrated with ceramic structurally. The first CCiPM was developed for an internal diameter of 60 mm as a magnet bore to establish the basic production techniques. The technique has been enhanced to realize narrower bore over 3 years, and finally, the achieved internal diameters were 40 and 30 mm in newly developed CCiPM. These super small bores have an expectation to conform to the size of the vacuum beam duct in the ring of a future light source. New CCiPMs are under the off-line test to confirm the vacuum durability, electrical characteristics, and magnetic performance, and the beam test for the CCiPM with 30 mm diameter has also proceeded in parallel. The points of production technique and the recent results of the off-line test will be presented in this conference.  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2021-FRXB04  
About • paper received ※ 19 May 2021       paper accepted ※ 19 July 2021       issue date ※ 31 August 2021  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)