JACoW logo

Joint Accelerator Conferences Website

The Joint Accelerator Conferences Website (JACoW) is an international collaboration that publishes the proceedings of accelerator conferences held around the world.


BiBTeX citation export for MOPAB091: Injection Section Upgrading with the Septum-Magnet Replacement in KEK-PF Ring

@inproceedings{mitsuda:ipac2021-mopab091,
  author       = {C. Mitsuda and K. Harada and N. Higashi and T. Honda and Y. Kobayashi and H. Miyauchi and S. Nagahashi and N. Nakamura and T. Nogami and T. Obina and M. Tadano and R. Takai and H. Takaki and Y. Tanimoto and T. Uchiyama and A. Ueda},
% author       = {C. Mitsuda and K. Harada and N. Higashi and T. Honda and Y. Kobayashi and H. Miyauchi and others},
% author       = {C. Mitsuda and others},
  title        = {{Injection Section Upgrading with the Septum-Magnet Replacement in KEK-PF Ring}},
  booktitle    = {Proc. IPAC'21},
  pages        = {342--345},
  eid          = {MOPAB091},
  language     = {english},
  keywords     = {injection, septum, vacuum, storage-ring, operation},
  venue        = {Campinas, SP, Brazil},
  series       = {International Particle Accelerator Conference},
  number       = {12},
  publisher    = {JACoW Publishing, Geneva, Switzerland},
  month        = {08},
  year         = {2021},
  issn         = {2673-5490},
  isbn         = {978-3-95450-214-1},
  doi          = {10.18429/JACoW-IPAC2021-MOPAB091},
  url          = {https://jacow.org/ipac2021/papers/mopab091.pdf},
  note         = {https://doi.org/10.18429/JACoW-IPAC2021-MOPAB091},
  abstract     = {{In 2015, the water leakage happened at the cooling pipe of the in-vacuum septum magnet installed into the injection point. Because the maintenance of the leakage needed the total replacement of the magnet, the water circulation was stopped permanently, and accordingly, the light absorber was installed upstream in the storage ring to prevent the synchrotron light of the bending magnet from coming to the septum wall. This treatment temporally worked well, but the beam injection efficiency was decreased to about 30% due to the physical aperture narrowed by the absorber. With the desired replacement of septum magnet to maintainable out-vacuum type, the injection section upgrading was simultaneously planned to recover and improve the injection efficiency. In this upgrade, the injection beam is closed to the stored beam more than before by adapting the thinner septum structure as a way to improve the injection efficiency. And some new ideas are introduced in the part of monitor and beam duct, for example, realtime beam monitor, thinner Inconel duct. The detailed design of the upgraded injection section and technical points will be reviewed in this conference.}},
}