TUPAB031 Construction and Installation of the New CERN Proton Synchrotron Internal Beam Dumps 1409
 
  • K.G. Andersen, M. Calviani, A. Cherif, T. Coiffet, A. De Macedo, S. Devidal, J.-M. Geisser, S.S. Gilardoni, M.M.J. Gillet, E. Grenier-Boley, J.M. Heredia, A. Majbour, F. Monnet, M.R. Monteserin, F.-X. Nuiry, D. Pugnat, G. Romagnoli, Y.D.R. Seraphin, J.A.F. Somoza, N. Thaus
    CERN, Geneva, Switzerland
 
  In the framework of the CERN Large Hadron Collider Injectors Upgrade (LIU) Project, the Proton Synchrotron (PS) has been equipped with two new movable Internal Dumps (PSID), each of them capable of absorbing particle beams of an energy of up to 100 kJ. These dumps replace the old Internal Dumps, which have been operated in the accelerator complex since their installation in 1975 until their decommissioning and removal from the machine during the second LHC Long Shut down (LS2). This contribution will address the construction and testing phases of the new PSIDs, including the assembly of the dump core, its actuation system and the respective shielding, mechanical running-in tests, metrology adjustments, Ultra-High Vacuum (UHV) and impedance acceptance tests. The described installation work was completed successfully, and the new generation Dumps are currently operational in the PS machine.  
poster icon Poster TUPAB031 [3.146 MB]  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2021-TUPAB031  
About • paper received ※ 18 May 2021       paper accepted ※ 27 May 2021       issue date ※ 26 August 2021  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
WEPAB366 Towards the Last Stages of the CERN’s AD-Target Area Consolidation Project and Recommissioning Plans to Resume Operation 3563
 
  • C. Torregrosa, C. Ahdida, A. Bouvard, A. Broche, S. Burger, M.E.J. Butcher, M. Calviani, V. Clerc, A. De Macedo, S. De Man, F.A. Deslande, M. Di Castro, T. Dobers, T. Feniet, R. Ferriere, E. Fornasiere, R. Franqueira Ximenes, T.J. Giles, J.L. Grenard, E. Grenier-Boley, G. Gräwer, M. Guinchard, M.D. Jedrychowski, K. Kershaw, B. Lefort, E. Lopez Sola, J.M. Martin Ruiz, A. Martínez Sellés, G. Matulenaite, C.Y. Mucher, A. Newborough, M. Perez Ornedo, E. Perez-Duenas, A. Perillo-Marcone, L. Ponce, N. Solieri, M.B. Szewczyk, P.A. Thonet, M.A. Timmins, A. Tursun, W. Van den Broucke, F.M. Velotti, C. Vendeuvre, V. Vlachoudis
    CERN, Meyrin, Switzerland
  • J.C. Espadanal
    LIP, Lisboa, Portugal
 
  Antiprotons are produced at CERN at the Antiproton Decelerator (AD) Target Area by impacting 26 GeV/c proton beams onto a fixed target. Further collection, momentum selection, and transport of the secondary particles - including antiprotons - towards the AD ring is realised by a 400 kA pulsed magnetic horn and a set of magnetic dipoles and quadrupoles. A major consolidation of the area - in operation since the 80s - has taken place during the CERN Long Shutdown 2 (2019-2021). Among other activities, such upgrade included: (i) Installation of a new air-cooled target design and manufacturing of a new batch of magnetic horns, including a surface pulsing test-bench for their validation and fine-tuning (ii) Installation of a new positioning and maintenance system for the target and horn (iii) Refurbishment and decontamination of the Target Area and its equipment, (iv) Construction of a new surface service building to house new nuclear ventilation systems. This contribution presents an overview of such activities and lesson learnt. In addition, it provides the latest results from refractory metals R&D for the antiproton target and a summary of the recommissioning and optimization plans.  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2021-WEPAB366  
About • paper received ※ 18 May 2021       paper accepted ※ 21 June 2021       issue date ※ 01 September 2021  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)