Paper |
Title |
Page |
TUPIK033 |
Test and Commissioning Results of NSC KIPT 100 MeV/ 100 kW Electron Linear Accelerator, Subcritical Neutron Source Driver |
1751 |
|
- A.Y. Zelinsky, O.E. Andreev, V.P. Androsov, S.V. Bazarov, O. Bezditko, O.V. Bykhun, Y.L. Chi, A.N. Gordienko, V.A. Grevtsev, A. Gvozd, D.Y. He, X. He, V.E. Ivashchenko, A.A. Kalamayko, I.I. Karnaukhov, I.M. Karnaukhov, X.C. Kong, V.P. Lyashchenko, H.Z. Ma, M. Moisieienko, S. Pei, X.H. Peng, A.V. Reuzayev, I.M. Subotenko, D.V. Tarasov, V.I. Trotsenko, X. Wang
NSC/KIPT, Kharkov, Ukraine
- Y.L. Chi, D.Y. He, X. He, X.C. Kong, H.Z. Ma, S. Pei, X.H. Peng, X. Wang
IHEP, Beijing, People's Republic of China
- S. Shu
Institute of High Energy Physics (IHEP), Chinese Academy of Sciences, Beijing, People's Republic of China
|
|
|
Neutron Source on the base of subcritical assembly has been constructed and is under commissioning in NSC KIPT, Kharkov, Ukraine. The source uses 100 MeV/ 100 kW electron linear accelerator as a driver. The accelerator was designed and manufactured in IHEP, Beijing, China. The accelerator has been assembled at NSC KIPT, all accelerator systems and components were and accelerator is under commissioning. Reports describes the status of the NSC KIPT 100 MeV/ 100 kW electron linear accelerator. The results of the first tests are presented.
|
|
DOI • |
reference for this paper
※ https://doi.org/10.18429/JACoW-IPAC2017-TUPIK033
|
|
Export • |
reference for this paper using
※ BibTeX,
※ LaTeX,
※ Text/Word,
※ RIS,
※ EndNote (xml)
|
|
|
TUPIK034 |
NSC KIPT Neutron Source on the Base of Subcritical Assembly With Electron Linear Accelerator Driver |
1754 |
|
- A.Y. Zelinsky, I.M. Karnaukhov, A. Mytsykov, I. Ushakov
NSC/KIPT, Kharkov, Ukraine
- Y.L. Chi
IHEP, Beijing, People's Republic of China
- Y. Gohar
ANL, Argonne, Illinois, USA
|
|
|
National Science Center Kharkov Institute of Physics & Technology (NSC KIPT) together with ANL, Chicago, USA developed up to date scientific facility that is Neutron Source on the base of subcritical assembly driven with 100 MeV/100 kW electron accelerator. During bombarding of the Tungsten or Uranium targets the electron beam generates the original neutrons that are multiplied in the facility core of low enriched uranium trough the fission process. The maximal value of the neutron multiplication factor is 0.98. So the total neutron flux output is increased as much as 50 times and is 2·10 13 n·cm-2·c-1. The subcriticality of the system eliminates the possibility of self-sustained chain reaction existence that increases the nuclear safety of the facility drastically. The neutron source mentioned above is the first facility of such type in the world. The results that will be obtained at studies of neutron characteristics of the neutron source with low enriched uranium core and during optimization of the operation modes of the facility systems will became the scientific background for the further development of the safe, ecological nuclear energetics of the future.
|
|
DOI • |
reference for this paper
※ https://doi.org/10.18429/JACoW-IPAC2017-TUPIK034
|
|
Export • |
reference for this paper using
※ BibTeX,
※ LaTeX,
※ Text/Word,
※ RIS,
※ EndNote (xml)
|
|
|
THPVA069 |
NSC KIPT Experience in Use of Laser Tracker Leica at 401 in Equipment Alignment of 100 MeV/100 KW Electron Linear Accelerator of Neutron Source Driver |
4604 |
|
- M. Moisieienko, O. Bezditko, I.M. Karnaukhov, A. Mytsykov, A.Y. Zelinsky
NSC/KIPT, Kharkov, Ukraine
|
|
|
For successful operation of electron linear accelerator that is driver of NSC KIPT Neutron source it is necessary that all the acceleration sections and all the electromagnetic elements should be installed in design position according to the designed lattice. Accuracies of all electromagnetic elements installation are 150 mkm in transverse positions and 200 mrad for all three rotation directions. The whole process, fiducialization and developing of coordinate net, is controlled by Laser tracker Leica AT 401. Well-planned methods allow to realize uniform irradiation of neutron-generation target.
|
|
DOI • |
reference for this paper
※ https://doi.org/10.18429/JACoW-IPAC2017-THPVA069
|
|
Export • |
reference for this paper using
※ BibTeX,
※ LaTeX,
※ Text/Word,
※ RIS,
※ EndNote (xml)
|
|
|
THPVA070 |
Cooling and Thermo Stabilization System of 100MeV/100kW Electron Linear Accelerator of Neutron Source Driver |
4607 |
SUSPSIK115 |
|
|
- M. Moisieienko, I.M. Karnaukhov, A. Mytsykov, A.Y. Zelinsky
NSC/KIPT, Kharkov, Ukraine
|
|
|
Cooling system and temperature control technology elements of the linear electron accelerator of 100 MeV/100kW is a complex technological system composed of three subsystems: the cooling klystron gallery equipment (30 C ± 1), cooling of the accelerator tunnel equipment (30 C ± 1) and the cooling and temperature control accelerating sections and waveguide (40 ° C ± 0,2). The block diagram of cooling and temperature control of the linear electron accelerator of 100 MeV/100 kW, describes the basic principles to formulate requirements to the cooling systems. It describes the status of the installation, commissioning and testing of the cooling and temperature control of the accelerator - driver subcritical neutron source KIPT.
|
|
DOI • |
reference for this paper
※ https://doi.org/10.18429/JACoW-IPAC2017-THPVA070
|
|
Export • |
reference for this paper using
※ BibTeX,
※ LaTeX,
※ Text/Word,
※ RIS,
※ EndNote (xml)
|
|
|