TUOAA01 Operation of LANSCE Linear Accelerator with Double Pulse Rate and Low Beam Losses 1004
 
  • Y.K. Batygin, J.S. Kolski, R.C. McCrady, L. Rybarcyk
    LANL, Los Alamos, New Mexico, USA
 
  Funding: Work supported by US DOE under contract DE-AC52-06NA25396
In 2014 LANSCE accelerator facility return to 120 Hz pulse rate operation after long period of operation at 60 Hz pulse rate. Increased capabilities require careful tuning of all components of linear accelerator. Transformation to double pulse rate resulted in re-evaluation of tuning procedures in order to meet new challenges in beam operation. The paper summarizes experimental activity on sustaining of high productivity of accelerator facility while keeping beam losses along accelerator at the low level.
 
slides icon Slides TUOAA01 [14.886 MB]  
DOI • reference for this paper ※ DOI:10.18429/JACoW-IPAC2016-TUOAA01  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
TUOAA02 Status and Performance of ORNL Spallation Neutron Source Accelerator Systems 1007
 
  • Y.W. Kang, A.V. Aleksandrov, D.E. Anderson, M.S. Champion, M.T. Crofford, J. Galambos, B. Han, S.-H. Kim, S.W. Lee, J. Moss, V.V. Peplov, C. Piller, M.A. Plum, R.T. Roseberry, J.P. Schubert, A.P. Shishlo, M.P. Stockli, C.M. Stone, R.F. Welton, M. Wezensky, D.C. Williams, A.P. Zhukov
    ORNL, Oak Ridge, Tennessee, USA
  • L.A. Longcoy, M. Magda, M.E. Middendorf, W.S. Passmore, C.C. Peters, J. Price, R.B. Saethre, J. Saunders
    ORNL RAD, Oak Ridge, Tennessee, USA
 
  Funding: This work was supported by SNS through UT-Battelle, LLC, under contract DE-AC05-00OR22725 for the U.S. DOE.
The Spallation Neutron Source (SNS) accelerator sys-tems have been performing continuously and progressively since commissioning in 2006 to deliver the neutrons to beamlines. The 1.4 MW design beam power has been demonstrated during 24/7 operation while developments and investigations for system improvements are still ongoing to achieve the full design beam power and availability. Numerous difficulties that impeded reaching the full performance of the SNS accelerator systems have been identified and are being eliminated through repairs, upgrades, and developments. In this report, operational performance and developments of the accelerator systems are presented along with the efforts for future upgrades of the SNS.
 
slides icon Slides TUOAA02 [5.410 MB]  
DOI • reference for this paper ※ DOI:10.18429/JACoW-IPAC2016-TUOAA02  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
TUOAA03 Long Term Plans to Increase Fermilab's Proton Intensity to Meet the Needs of the Long Baseline Neutrino Program 1010
 
  • E. Prebys, P. Adamson, S.C. Childress, P. Derwent, S.D. Holmes, I. Kourbanis, V.A. Lebedev, W. Pellico, A. Romanenko, V.D. Shiltsev, E.G. Stern, A. Valishev, R.M. Zwaska
    Fermilab, Batavia, Illinois, USA
 
  Funding: This work is supported by the US Department of Energy under contract No. De-AC02-07CH11359.
The flagship of Fermilab's long term research program is the Deep Underground Neutrino Experiment (DUNE), located Sanford Underground Research Facility (SURF) in Lead, South Dakota, which will study neutrino oscillations with a baseline of 1300 km. The neutrinos will be produced in the Long Baseline Neutrino Facility (LBNF), a proposed new beam line from Fermilab's Main Injector. The physics goals of the DUNE require a proton beam with a power of roughly 2.5 MW at 120 GeV, which is roughly five times the current maximum power. This poster outlines the staged plan to achieve the required power over the next 15 years.
 