Author: Bracco, C.
Paper Title Page
MOPOR024 Evolution of High Intensity Beams in the CERN PS Booster after H Injection and Phase Space Painting 656
 
  • M. Cieslak-Kowalska, J.L. Abelleira, E. Benedetto, C. Bracco
    CERN, Geneva, Switzerland
 
  With the LHC Injector Upgrade (LIU) project, the injection energy of PS Booster (PSB) ' first circular accelerator in the LHC injector chain ' will be raised from 50 MeV to 160 MeV and the present multiturn injection will be upgraded to H injection with transverse and longitudinal painting. In the scope of this project, it is planned to double the beam intensities, profiting from the fact that the βγ2 factor will be two times larger (0.35 at 50 MeV and 0.71 at 160 MeV), so the resulting tune spread driven by a direct space charge should remain similar. This paper describes the feasibility to double the intensity of high intensity and large emittance beams, looking into the evolution under space charge and taking into account losses constrains in the ring and in the extraction lines.  
DOI • reference for this paper ※ DOI:10.18429/JACoW-IPAC2016-MOPOR024  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
MOPOR025 3D Emittances Tailoring Techniques and Optimization with Space Charge for the Future CERN PS Booster Operations with Linac4 660
 
  • V. Forte, J.L. Abelleira, E. Benedetto, C. Bracco, M. Cieslak-Kowalska, G.P. Di Giovanni
    CERN, Geneva, Switzerland
 
  In the frame of the LIU (LHC Injectors Upgrade) project, the CERN PS Booster is going to be renovated to host a new H charge-exchange injection from the Linac4. One important feature of the new injection scheme is the possibility to tailor a wide range of 3D emittances for CERN's different users in an intensity span in the order of 5·109 to 1.6·1013 protons per PSB ring. This paper gives an overview of 3D multi-turn injection techniques, focusing on the future LHC beams, which aim at reaching high brightness, and on highest intensity beams (ISOLDE), where losses are the main concern. Complete RF capture simulations and transverse injection maps, including space charge effects, are presented and also intended to be used during the commissioning with Linac4.  
DOI • reference for this paper ※ DOI:10.18429/JACoW-IPAC2016-MOPOR025  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
TUOBB03 CERN AWAKE Facility Readiness for First Beam 1071
 
  • C. Bracco, M. Bernardini, A.C. Butterworth, H. Damerau, S. Döbert, V. Fedosseev, E. Feldbaumer, E. Gschwendtner, W. Höfle, A. Pardons, E.N. Shaposhnikova, H. Vincke
    CERN, Geneva, Switzerland
 
  The AWAKE project at CERN was approved in August 2013 and since then a big effort was made to be able to probe the acceleration of electrons before the "2019-2020 Long Shutdown". The next steps in this challenging schedule will be a dry run of all the beam line systems, at the end of the HW commissioning in June 2016, and the first proton beam sent to the plasma cell one month later. The current status of the project is presented together with an outlook over the foreseen works for operation with electrons in 2018.  
slides icon Slides TUOBB03 [10.682 MB]  
DOI • reference for this paper ※ DOI:10.18429/JACoW-IPAC2016-TUOBB03  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
TUPMR052 Commissioning Preparation of the AWAKE Proton Beam Line 1374
 
  • J.S. Schmidt, B. Biskup, C. Bracco, B. Goddard, R. Gorbonosov, M. Gourber-Pace, E. Gschwendtner, L.K. Jensen, O.R. Jones, V. Kain, S. Mazzoni, M. Meddahi
    CERN, Geneva, Switzerland
 
  The AWAKE experiment at CERN will use a proton bunch with an momentum of 400 GeV/c from the SPS to drive large amplitude wakefields in a plasma. This will require a ~830 m long transfer line from the SPS to the experiment. The prepa- rations for the beam commissioning of the AWAKE proton transfer line are presented in this paper. They include the detailed planning of the commissioning steps, controls and beam instrumentation specifications as well as operational tools, which are developed for the steering and monitoring of the beam line. The installation of the transfer line has been finished and first beam is planned in summer 2016.  
DOI • reference for this paper ※ DOI:10.18429/JACoW-IPAC2016-TUPMR052  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
WEPMW033 Validation of Simulation Tools for Fast Beam Failure Studies in the LHC 2506
 
  • E. Quaranta, C. Bracco, R. Bruce, S. Redaelli
    CERN, Geneva, Switzerland
 
  The LHC collimation system protects passively the most sensitive machine equipment against beam losses. In particular, collimators are the last line of defense in case of single-turn failures that cannot be caught by the standard interlock system. The collimator settings are conceived to protect the machine even for very rare events, like beam abort failures with a full machine. Collimator settings are established in simulations through a dedicated tracking setup but also empirically validated by beam measurements at low intensities. A benchmark of simulations is essential for reliably estimating the response of the system for future machine configurations and beam parameters. In the paper, results are presented of tracking simulations for different optics deployed in the LHC Run II at 6.5 TeV and compared with data.  
DOI • reference for this paper ※ DOI:10.18429/JACoW-IPAC2016-WEPMW033  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
WEPMY019 AWAKE, the Advanced Proton Driven Plasma Wakefield Acceleration Experiment 2588
 
  • P. Muggli
    MPI, Muenchen, Germany
  • C. Bracco
    CERN, Geneva, Switzerland
 
  The Advanced Proton Driven Plasma Wakefield Acceleration Experiment (AWAKE) aims at studying plasma wakefield generation and electron acceleration driven by proton bunches. It is a proof-of-principle R&D experiment at CERN and the world's first proton driven plasma wakefield acceleration experiment. The AWAKE experiment is currently being installed in the former CNGS facility and will use the 400 GeV/c proton beam bunches from the SPS to drive the wakefields in the plasma. The first experiments will focus on the self-modulation instability of the long (rms ~12 cm) proton bunch in the plasma. These experiments are planned for the end of 2016. Later, in 2017/2018, low energy (~15 MeV) electrons will be externally injected to sample the wakefields and be accelerated with GeV/m gradients. The main goals of the experiment will be summarized. A summary of the AWAKE design and construction status will be presented.  
DOI • reference for this paper ※ DOI:10.18429/JACoW-IPAC2016-WEPMY019  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
THPMW035 Considerations on an Upgrade Possibility of the LHC Beam Dump Kicker System 3631
 
  • M.A. Fraser, W. Bartmann, C. Bracco, L. Ducimetière, B. Goddard, T. Kramer, V. Senaj
    CERN, Geneva, Switzerland
 
  The LHC Beam Dump System (LBDS) is designed to safely dispose the circulating beams over a wide range of energy from 450 GeV up to 7 TeV, where the maximum stored energy is 362 MJ per beam. One of the most critical components of the LBDS are the extraction kickers that must reliably switch on within the 3 us particle-free abort gap. To ensure this functionality, even in the event of a power-cut, the power generator capacitors remain charged and hence the Gate Turn-Off (GTO) switch stack has to hold the full voltage throughout beam operation. The increase of the LHC collision energy to 13 TeV has increased the voltage levels at the GTO stacks and during re-commissioning an increased rate of high-voltage (HV) related issues at the level of the GTO stack was observed. Different solutions have been analysed and an improved GTO stack will be implemented. This paper also outlines the benefit of adding more kicker magnets to improve the voltage hold off issues and to improve the tolerance to missing kickers during extraction.  
DOI • reference for this paper ※ DOI:10.18429/JACoW-IPAC2016-THPMW035  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
THPOR051 Beam Based Measurements to Check Integrity of LHC Dump Protection Elements 3908
 
  • C. Bracco, W. Bartmann, M.A. Fraser, B. Goddard, A. Lechner
    CERN, Geneva, Switzerland
 
  LHC operation is approaching its nominal operating goals and several upgrades are also being prepared to increase the beam intensity and brightness. In case of an asynchronous beam dump at 6.5 - 7 TeV a non-negligible fraction of the stored energy (360 MJ during nominal operation) will be deposited on the protection elements (TCDQ and TCDS) located downstream of the extraction kickers. These elements are designed to protect the machine aperture from the large amplitude particles resulting from the asynchronous dump. A number of checks and measurements with beam have been worked out to verify the integrity of these elements, after a potentially harmful event, without opening the machine vacuum. Details on measurements and simulations performed to evaluate the validity of the proposed method are presented in this paper.  
DOI • reference for this paper ※ DOI:10.18429/JACoW-IPAC2016-THPOR051  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
THPOR052 A Beam-based Measurement of the LHC Beam Dump Kicker Waveform 3911
 
  • M.A. Fraser, W. Bartmann, C. Bracco, E. Carlier, B. Goddard, V. Kain, N. Magnin, J.A. Uythoven, F.M. Velotti
    CERN, Geneva, Switzerland
 
  The increase of the LHC collision energy to 13 TeV after Long Shutdown 1 has doubled the operational energy range of the LHC beam dump system (LBDS) during Run 2. In preparation for the safe operation of the LHC, the waveform of the LBDS extraction kicker was measured using beam-based measurements for the first time during the machine's re-commissioning period. The measurements provide a reference for a more precise synchronisation of the dump system and abort-gap timing, and provide an independent check of the system's calibration. The precision of the beam-based technique allowed the necessary adjustments to the LBDS trigger delays to ensure the synchronous firing of the LBDS at all beam energies up to 6.5 TeV. In this paper the measurement and simulation campaign is described and the performance of the system reported.  
DOI • reference for this paper ※ DOI:10.18429/JACoW-IPAC2016-THPOR052  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
THPOR054 Analysis of the SPS Long Term Orbit Drifts 3914
 
  • F.M. Velotti, C. Bracco, K. Cornelis, L.N. Drøsdal, M.A. Fraser, B. Goddard, V. Kain, M. Meddahi
    CERN, Geneva, Switzerland
  • E. Gianfelice-Wendt
    Fermilab, Batavia, Illinois, USA
 
  The Super Proton Synchrotron (SPS) is the last accelerator in the Large Hadron Collider (LHC) injector chain, and has to deliver the two high-intensity 450 GeV proton beams to the LHC. The transport from SPS to LHC is done through the two Transfer Lines (TL), TI2 and TI8, for Beam 1 (B1) and Beam 2 (B2) respectively. During the first LHC operation period Run 1, a long term drift of the SPS orbit was observed, causing changes in the LHC injection due to the resulting changes in the TL trajectories. This translated into longer LHC turnaround because of the necessity to periodically correct the TL trajectories in order to preserve the beam quality at injection into the LHC. Different sources for the SPS orbit drifts have been investigated: each of them can account only partially for the total orbit drift observed. In this paper, the possible sources of such drift are described, together with the simulated and measured effect they cause. Possible solutions and countermeasures are also discussed.  
DOI • reference for this paper ※ DOI:10.18429/JACoW-IPAC2016-THPOR054  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
THPOR055 Characterisation of the SPS Slow-extraction Parameters 3918
 
  • F.M. Velotti, W. Bartmann, T. Bohl, C. Bracco, K. Cornelis, M.A. Fraser, B. Goddard, V. Kain, L.S. Stoel
    CERN, Geneva, Switzerland
 
  The Super Proton Synchrotron (SPS) is the last accelerator in the Large Hadron Collider (LHC) injector chain but its main users are the fixed-target experiments located in the North Area (NA). The beams, which are among the most intense circulating in the SPS, are extracted to the NA over several thousands of turns by exploiting a third-integer resonant extraction. The unavoidable losses intrinsic to such an extraction makes its optimisation one of the main priorities for operation, to reduce beam induced activation of the machine. The settings of the extraction systems, together with the tune sweep speed and the beam characteristics (momentum spread, emittance, etc.) are the parameters that can be controlled for spill and loss optimisation. In this paper, the contribution of these parameters to the slow-extraction spill quality are investigated through tracking simulations. The simulation model is compared with beam measurements and optimisations suggested.  
DOI • reference for this paper ※ DOI:10.18429/JACoW-IPAC2016-THPOR055  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)