Author: Hsu, K.H.
Paper Title Page
MOPO032 The Survey Status at NSRRC during the TPS Civil Construction 553
 
  • H.M. Luo, J.-R. Chen, Chen, M. L. Chen, H.C. Ho, K.H. Hsu, W.Y. Lai, C.J. Lin, S.Y. Perng, P.L. Sung, Y.L. Tsai, T.C. Tseng, H.S. Wang
    NSRRC, Hsinchu, Taiwan
 
  In this paper, the survey status at NSRRC site duirng the TPS (Taiwan Photon Source) civil construction is described. The TLS (Taiwan Light Source) ring is still under operation in the meantime. In order to maintain the TLS for normal operation and also monitoring the building construction, an expanded survey setups including permanent leveling and GPS monuments were installed both on the site and TPS building. Combined with the orignal TLS survey sockets and sensor monitoring system (hydrostatic leveling system and precision inclination sensors) installed both in the TLS storage ring and beamlines, an extensive survey tasks were performed. The ground deformation situation of the TLS and deviation of the TPS building construction are presented.  
 
MOPO033 Design and Development of a Laser Positioning System for TPS Magnets Alignment Inspection during the Installation on a Girder 556
 
  • Chen, M. L. Chen, H.C. Ho, K.H. Hsu, W.Y. Lai, S.Y. Perng, Y.L. Tsai, T.C. Tseng, H.S. Wang
    NSRRC, Hsinchu, Taiwan
  • J.-R. Chen
    National Tsing Hua University, Hsinchu, Taiwan
 
  A novel optical inspection architecture is designed and developed for positioning the TPS (Taiwan Photon Source) quadrupole and sextupole magnets on the girder within 30 um. This positioning system is a laser-based scheme consists of two laser position sensing devices (PSD) and two granite blocks as the standard reference of magnets. The laser position sensing device (PSD) is mounted on an adjustable circular steel module and the module is installed in a granite block. With the PSD position being adjusted and corrected, the PSD module center can be identical to the ideal pole position of magnets on the girder within 10um. The Laser ray is also adjusted and aligned according to the ideal reference line of magnets. Finally the granite blocks are replaced with the quadrupole and sextupole magnets at installation, the assembling error of magnets can be detected from the PSD module. This paper describes the detail of the system development and testing results.  
 
MOPO034 From Survey Alignment toward Auto-alignment for the Installation of the TPS Storage Ring Girder System 559
 
  • T.C. Tseng, Chen, M. L. Chen, H.C. Ho, K.H. Hsu, W.Y. Lai, C.J. Lin, H.M. Luo, S.Y. Perng, P.L. Sung, Y.L. Tsai, H.S. Wang
    NSRRC, Hsinchu, Taiwan
  • J.-R. Chen
    National Tsing Hua University, Hsinchu, Taiwan
 
  The TPS (Taiwan Photon Source) project is now under civil construction. The whole building is constructed half underground and 12m deep compared to the TLS due to the stability consideration, so the survey and alignment works are quite confined and difficult. For positioning the magnets precisely and quickly, a high accuracy auto-tuning girders system combined with survey network procedures were established to accomplish the installation tasks. The position data from the survey network will define a basis for the motorized girder system to auto-tune and improve the accuracy. A mockup of one twenty-fourth section (one cell) had been installed at NSRRC for interface examination and further testing. In this paper, the procedures from the traditional survey network to auto-aliment system design and algorithm are described. Meanwhile, a preliminary testing result is also included.  
 
THPC146 The Radiated EMI Isolation for TPS Kicker Magnet* 3227
 
  • C.S. Chen, C.K. Chan, C.L. Chen, Y.L. Chu, K.H. Hsu, C.Y. Kuo, Y.-H. Liu, C.-S. Yang
    NSRRC, Hsinchu, Taiwan
 
  Electromagnetic interference is a critical problem for electronic equipment, especially for those sophisticated measuring sensors using in TLS. Therefore, lots of efforts have been made to isolate the EM noise from the kicker magnets. In this article, different thicknesses of aluminum chambers are applied to block the radiated EM noise. Furthermore, the different widths of slits simulate the necessary openings on kicker assembly. According to the results of small-scale experiment, some parameters are obtained to design the enclosure of kicker magnet. Compared the results with the data from the original scale kicker, these parameters provide a believable guideline in the beginning of design status.  
 
THPC147 TPS SR Kicker Prototype Installation Status* 3230
 
  • Y.-H. Liu, C.K. Chan, C.-S. Chen, Y.L. Chu, K.H. Hsu, H.P. Hsueh, C.K. Kuan, C.Y. Kuo, C.-S. Yang
    NSRRC, Hsinchu, Taiwan
 
  The purpose of this paper is to illustrate the installation sequence of TPS SR kicker. Because of adding the rotation function in row direction, the position of every component of kicker must be very precise. The kicker magnet and EMI enclosure were fastened on the rotation motor plate which could rotate ±3.0 mrad. The ceramic chamber remain fixed on the bottom plate in order to let the bellow stress free during rotation. After installation, the inductance measurement and the high voltage breakdown test were also tested. The experimental results showed the good uniformity and reached the expected request. The field mapping and EMI prevention schemes will be tested in the future.