Author: Borburgh, J.
Paper Title Page
WEPS018 The Proposed CERN Proton-Synchrotron Upgrade Program 2520
 
  • S.S. Gilardoni, S. Bart Pedersen, W. Bartmann, S. Bartolome, O.E. Berrig, C. Bertone, A. Blas, D. Bodart, J. Borburgh, R.J. Brown, A.C. Butterworth, M.C.L. Buzio, C. Carli, P. Chiggiato, H. Damerau, T. Dobers, R. Folch, R. Garoby, B. Goddard, M. Gourber-Pace, S. Hancock, M. Hourican, P. Le Roux, L.A. Lopez Hernandez, A. Masi, G. Metral, Y. Muttoni, E. Métral, M. Nonis, J. Pierlot, S. Pittet, C. Rossi, I. Ruehl, G. Rumolo, L. Sermeus, R.R. Steerenberg, M. Widorski
    CERN, Geneva, Switzerland
 
  In the framework of the High-Luminosity LHC project, the CERN Proton Synchrotron would require a major upgrade to match the future beam parameters requested as pre-injector of the collider. The different beam dynamics issues, from space-charge limitations to longitudinal instabilities are discussed, as well as the proposed technical solutions to overcome them, covering the increase of the injection energy to RF related improvements.  
 
WEPS019 Study of a Rapid Cycling Synchrotron to Replace the CERN PS Booster 2523
 
  • K. Hanke, O. Aberle, M. E. Angoletta, B. Balhan, W. Bartmann, M. Benedikt, J. Borburgh, D. Bozzini, C. Carli, P. Dahlen, T. Dobers, M. Fitterer, R. Garoby, S.S. Gilardoni, B. Goddard, J. Hansen, T. Hermanns, M. Hourican, S. Jensen, A. Kosmicki, L.A. Lopez Hernandez, M. Meddahi, B. Mikulec, A. Newborough, M. Nonis, S. Olek, M.M. Paoluzzi, S. Pittet, B. Puccio, V. Raginel, I. Ruehl, H.O. Schönauer, L. Sermeus, R.R. Steerenberg, J. Tan, J. Tückmantel, M. Vretenar, M. Widorski
    CERN, Geneva, Switzerland
 
  CERN’s proton injector chain is undergoing a massive consolidation and upgrade program in order to deliver beams meeting the needs of the LHC Luminosity Upgrade. As an alternative to the upgrade of the existing Proton Synchrotron Booster (PSB), the construction of a Rapid Cycling Synchrotron (RCS) has been studied. This machine would replace the PSB and deliver beams to the LHC as well as to CERN’s rich fixed-target physics program. This paper summarizes the outcome of the feasibility study along with a tentative RCS design.  
 
WEPS020 Study of an Energy Upgrade of the CERN PS Booster 2526
 
  • K. Hanke, O. Aberle, M. E. Angoletta, W. Bartmann, S. Bartolome, C. Bertone, A. Blas, J. Borburgh, D. Bozzini, A.C. Butterworth, C. Carli, P. Dahlen, T. Dobers, A. Findlay, R. Folch, N. Gilbert, J. Hansen, T. Hermanns, S. Jensen, P. Le Roux, L.A. Lopez Hernandez, E. Mahner, A. Masi, B. Mikulec, Y. Muttoni, A. Newborough, D. Nisbet, M. Nonis, S. Olek, M.M. Paoluzzi, S. Pittet, B. Puccio, V. Raginel, I. Ruehl, J. Tan, B. Todd, W.J.M. Weterings, M. Widorski
    CERN, Geneva, Switzerland
 
  CERN’s LHC injector chain will have to deliver beams with ultimate brilliance as the LHC is heading for increased luminosity in the coming years. In order to overcome bottlenecks in the injector chain, an increase of the beam transfer energy from the CERN Proton Synchrotron Booster (PSB) to the Proton Synchrotron (PS) has been investigated as a possible upgrade scenario. This paper gives an overview of the technical solutions and summarizes the conclusions of the feasibility study.  
 
THPS048 Design of Electrostatic Septa and Fast Deflector for MedAustron 3532
 
  • J. Borburgh, T. Fowler, A. Prost
    CERN, Geneva, Switzerland
  • T. Kramer, T. Stadlbauer
    EBG MedAustron, Wr. Neustadt, Austria
 
  For the MedAustron facility, under construction in Wiener Neustadt, three electric field deflectors are developed in collaboration with CERN. A fast deflector is used in the Low Energy Beam Transfer line to chop the beam. The chopped beam is swept onto a Faraday cup for measurement purposes and to stop beam being sent towards the synchrotron. Electrostatic septa are used for the multi turn injection of protons and ions as well as for the slow extraction from the synchrotron. Novel design features for MedAustron include an inversed cathode/anode support and high voltage feedthroughs rated at 150 kV. The possibility for a higher voltage will significantly improve the conditioning process of the septa surfaces. This paper describes the requirements of these devices as well as the mechanical design and strategies adopted for their power supplies.  
 
THPS049 Feasibility Study of a CERN PS Injection at 2 GeV 3535
 
  • J. Borburgh, S. Aumon, W. Bartmann, S.S. Gilardoni, B. Goddard, L. Sermeus, R.R. Steerenberg
    CERN, Geneva, Switzerland
 
  In the framework of the potential CERN PS Booster (PSB) energy upgrade, a study was initiated to look into the possibilities and constraints to inject protons into the PS at kinetic energies up to 2 GeV, for LHC type beams and other (high intensity) beams. This paper highlights the identified bottlenecks and potential solutions and addresses the resulting requirements for the hardware in the transfer line and injection region of the PS. In conjunction with the proposed upgrade of the PSB-PS transfer line hardware the optics can be changed for different cycles. Optics solutions optimized for the different requirements of LHC type and other beams are presented.  
 
THPS054 Injection and Extraction Considerations for a 2 GeV RCS at CERN 3550
 
  • W. Bartmann, B. Balhan, J. Borburgh, L. Ducimetière, M. Fitterer, B. Goddard, L. Sermeus
    CERN, Geneva, Switzerland
 
  Conceptual studies have been made for a 2 GeV RCS at CERN as a possible replacement of the four-ring PS Booster. The lattice design has to accommodate suitable straight sections for a 160 MeV H charge exchange injection system, and for a 2 GeV fast extraction system. The design constraints for the injection and extraction systems are described, together with the proposed concepts and potential equipment limitations. In particular, the features of different possible H injection configurations are compared.