Author: Zhao, L.
Paper Title Page
THBR03 Prototype of White Rabbit Based Beam-Synchronous Timing Systems for SHINE 853
 
  • P.X. Yu, Y.B. Yan
    SSRF, Shanghai, People’s Republic of China
  • G.H. Gong
    Tsinghua University, Beijing, People’s Republic of China
  • G. Gu, Z.Y. Jiang, L. Zhao
    USTC, Hefei, Anhui, People’s Republic of China
  • Y.M. Ye
    TUB, Beijing, People’s Republic of China
 
  Shanghai HIgh repetition rate XFEL aNd Extreme light facility (SHINE) is under construction. SHINE requires precise distribution and synchronization of the 1.003086MHz timing signals over a long distance of about 3.1 km. Two prototype systems were developed, both containing three functions: beam-synchronous trigger signal distribution, random-event trigger signal distribution and data exchange between nodes. The frequency of the beam-synchronous trigger signal can be divided according to the accelerator operation mode. Each output pulse can be configured for different fill modes. A prototype system was designed based on a customized clock frequency point (64.197530MHz). Another prototype system was designed based on the standard White Rabbit protocol. The DDS (Direct Digital Synthesis) and D flip-flops (DFFs) are adopted for RF signal transfer and pulse configuration. The details of the timing system design and test results will be reported in this paper.  
slides icon Slides THBR03 [3.344 MB]  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-ICALEPCS2021-THBR03  
About • Received ※ 11 October 2021       Revised ※ 19 October 2021       Accepted ※ 22 December 2021       Issue date ※ 10 February 2022
Cite • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)