Status of the SARAF-Phase2 Control System |
93 |
|
- F. Gougnaud, P. Bargueden, G. Desmarchelier, A. Gaget, P. Guiho, A. Lotode, Y. Mariette, V. Nadot, N. Solenne
CEA-DRF-IRFU, France
- D. Darde, G. Ferrand, F. Gohier, T.J. Joannem, G. Monnereau, V. Silva
CEA-IRFU, Gif-sur-Yvette, France
- H. Isakov, A. Perry, E. Reinfeld, I. Shmuely, Y. Solomon, N. Tamim
Soreq NRC, Yavne, Israel
- T. Zchut
CEA LIST, Palaiseau, France
|
|
|
SNRC and CEA collaborate to the upgrade of the SARAF accelerator to 5 mA CW 40 Mev deuteron and proton beams and also closely to the control system. CEA is in charge of the Control System (including cabinets) design and implementation for the Injector (upgrade), MEBT and Super Conducting Linac made up of 4 cryomodules hosting HWR cavities and solenoid packages. This paper gives a detailed presentation of the control system architecture from hardware and EPICS software points of view. The hardware standardization relies on MTCA.4 that is used for LLRF, BPM, BLM and FC controls and on Siemens PLC 1500 series for vacuum, cryogenics and interlock. CEA IRFU EPICS Environment (IEE) platform is used for the whole accelerator. IEE is based on virtual machines and our MTCA.4 solutions and enables us to have homogenous EPICS modules. It also provides a development and production workflow. SNRC has integrated IEE into a new IT network based on advanced technology. The commissioning is planned to start late summer 2021.
|
|
|
Poster MOPV001 [1.787 MB]
|
|
DOI • |
reference for this paper
※ https://doi.org/10.18429/JACoW-ICALEPCS2021-MOPV001
|
|
About • |
Received ※ 09 October 2021 Revised ※ 20 October 2021
Accepted ※ 03 November 2021 Issue date ※ 11 March 2022 |
Cite • |
reference for this paper using
※ BibTeX,
※ LaTeX,
※ Text/Word,
※ RIS,
※ EndNote (xml)
|
|
|
TUPV007 |
Motorized Regulation Systems for the SARAF Project |
387 |
|
- T.J. Joannem, F. Gohier, F. Gougnaud, P. Lotrus
CEA-IRFU, Gif-sur-Yvette, France
- D. Darde
CEA, DES-ISAS-DM2S, Université Paris-Saclay, Gif-sur-Yvette, France
- P. Guiho, A. Roger, N. Solenne
CEA-DRF-IRFU, France
|
|
|
CEA is in charge of the tuning regulation systems for the SARAF-Linac project. These tuning systems will be used with LLRF to regulate the 3 Rebuncher cavities and the HWR cavities of the 4 cryomodules. These systems were already tested on the Rebuncher and Equipped Cavity Test stands to test respectively the warm and cold tunings. This paper describes the hardware and software architectures. Both tuning systems are based on Siemens PLC and EPICS-PLC communication. Ambiant temperature technology is based on SIEMENS motor controller solution whereas the cold one combines Phytron and PhyMOTION solutions.
|
|
|
Poster TUPV007 [0.892 MB]
|
|
DOI • |
reference for this paper
※ https://doi.org/10.18429/JACoW-ICALEPCS2021-TUPV007
|
|
About • |
Received ※ 08 October 2021 Revised ※ 22 October 2021
Accepted ※ 05 February 2022 Issue date ※ 10 February 2022 |
Cite • |
reference for this paper using
※ BibTeX,
※ LaTeX,
※ Text/Word,
※ RIS,
※ EndNote (xml)
|
|
|