A   B   C   D   E   F   G   H   I   J   K   L   M   N   O   P   Q   R   S   T   U   V   W   X   Y   Z  

Yoshikawa, H.

Paper Title Page
TOAB02 Current Status of the Control System for J-PARC Accelerator Complex 62
 
  • M. Adachi, S. F. Fukuta, S. H. Hatakeyama, M. T. Tanaka
    MELCO SC, Tsukuba
  • A. Akiyama, N. Kamikubota, T. Katoh, K. Kudo, T. Matsumoto, H. Nakagawa, J.-I. Odagiri, Y. Takeuchi, N. Yamamoto
    KEK, Ibaraki
  • H. Ikeda, T. Suzuki, N. T. Tsuchiya
    JAEA, Ibaraki-ken
  • Y. I. Itoh, Y. Kato, M. Kawase, H. Sakaki, H. Sako, G. B. Shen, H. Takahashi
    JAEA/J-PARC, Tokai-Mura, Naka-Gun, Ibaraki-Ken
  • S. Motohashi, M. Takagi, S. Y. Yoshida
    Kanto Information Service (KIS), Accelerator Group, Ibaraki
  • S. S. Sawa
    Total Support Systems Corporation, Tokai-mura, Naka-gun, Ibaraki
  • M. S. Sugimoto
    Mitsubishi Electric Control Software Corp, Kobe
  • H. Yoshikawa
    KEK/JAEA, Ibaraki-Ken
 
  J-PARC accelerator complex consists of a proton linac (LINAC), > a Rapid Cycle Synchrotron (RCS), and a Main Ring synchrotron (MR). The commissioning of LINAC already started in November 2006, while the commissioning of Main Ring synchrotron (MR) is scheduled in May 2008. Most of the machine components of MR have been installed in the tunnel. Introduction of electronic modules and wiring will be made by the end of 2007. For the control of MR, the J-PARC accelerator control network was extended to include the MR related parts in March 2007. IOC computers (VME-bus computers) for MR will be introduced in 2007. In addition, more server computers for application development will be also introduced in 2007. This paper reports the status of development for the J-PARC MR control system.  
slides icon Slides  
ROPB04 Beam Commissioning Software and Database for J-PARC LINAC 698
 
  • C. K. Allen
    LANL, Los Alamos, New Mexico
  • H. Ikeda
    Visual Information Center, Inc., Ibaraki-ken
  • H. Sakaki, G. B. Shen, H. Takahashi, H. Yoshikawa
    JAEA, Ibaraki-ken
  • H. Sako
    JAEA/J-PARC, Tokai-Mura, Naka-Gun, Ibaraki-Ken
 
  A beam commissioning software system based on a relational database (RDB) has been developed for the J-PARC LINAC. We developed two high-level software frameworks, JCE and XAL. JCE (Java Commissioning Environment) based on a scripting language SAD script has been developed in Java with device control, monitoring, online modelling and data analysis functions. XAL has been developed initially by SNS and developed for J-PARC. A commissioning database system has been developed to configure commonly these two frameworks, for model geometry, EPICS control, and calibration parameters. A server for unit conversion of magnet power supplies has also developed for the commissioning software. Commissioning applications for RF tuning, transverse matching, orbit correction, beam-based calibration, beam monitor controls have been developed using the two framework and successfully applied for beam tuning. We report on the status of development for the commissioning software system.  
slides icon Slides  
RPPA26 Database for Control System of J-PARC 3 GeV RCS 567
 
  • S. F. Fukuta
    MELCO SC, Tsukuba
  • Y. Kato, M. Kawase, H. Sakaki, H. Sako, H. Yoshikawa, H. Takahashi
    JAEA/J-PARC, Tokai-Mura, Naka-Gun, Ibaraki-Ken
  • S. S. Sawa
    Total Support Systems Corporation, Tokai-mura, Naka-gun, Ibaraki
  • M. Sugimoto
    Mitsubishi Electric Control Software Corp, Kobe
 
  The Control System of J-PARC 3GeV RCS is configured based on Database, which is comprised of Component Data Management DB (Component DB) and Data Acquisition DB (Operation DB. Component DB was developed mainly to manage the data on accelerator components and to generate EPICS records automatically using the data. Presently we are testing the reliability of DB application software at Linac operation. Later most Linac EPICS records are generated from DB, and we are able to operate Linac with very few problems. Operation DB collects the two kinds of data. One is EPICS records data, and the other is synchronized data. Now we are testing the reliability of application software for EPICS records data collection, and we have confirmed that EPICS record data are corrected with very few problems. Later Linac EPICS records data are inserted in Operation DB from Linac Operation start. On the other hand, application software for synchronized data collection is now being developed, and we will test the reliability of this application software from comprehensive information on RCS operation. We report on the status of development for Database for Control System of J-PARC 3GeV RCS.