  This paper surveys the recent developments in high level applications. Especially, the XAL framework and its new progress in LCLS is studied. The design philosophy and requirement analysis of CSNS high level applications are also discussed.  
RPPA31 Construction and Application of Database for CSNS 579
 
  • P. Chu
    SLAC, Menlo Park, California
  • C. H. Wang, Q. Gan
    IHEP Beijing, Beijing
 
  The database of the China Spallation Neutron Source (CSNS) Accelerator is designed to store machine parameters, magnet measurement data, survey and alignment data, control system configuration data, equipment historical data, e-logbook, and so on. It will also provide project management quality assurance, error impact analysis, and assembly assistance including sorting. This paper introduces the construction and application of the database for CSNS. Details such as convention name rules, database model and schema, interface of import and export data, and database maintenance will be presented.  
RPPA32 Energy Ramping in BEPCII 582
 
  • Q. Gan, J. Liu, H. L. Shi, J. C. Wang, X. L. Wang, C. H. Wang
    IHEP Beijing, Beijing
 
  The magnet power supply ramping synchronously is a fundamental procedure of the energy ramping of the BEPCII storage ring. The BEPCII has been put into synchrotron radiation operation (SR) (2.5GeV) research for 2 months after beams were successfully running in the Storage Ring with good beam performance. A software-based synchronization of the DAC setting on the power supplies is developed to achieve the relative magnet power supplies in the synchrotron ring ramped to the designed current synchronously. This paper introduces the schemes developed to perform energy ramping in the BEPCII storage ring and reports on the result of the operation carried out so far.