Author: Duran, J.I.
Paper Title Page
TUP029 A Hybrid Approach to Upgrade Hardware for the Proton Storage Ring Fast Kicker 250
 
  • T. Ramakrishnan, J.I. Duran, H.A. Watkins
    LANL, Los Alamos, New Mexico, USA
 
  Funding: Work supported by the U.S. Department of Energy, contract no. 89233218CNA000001. LA-UR-23-25123
The Los Alamos Neutron Science Center (LANSCE) Proton Storage Ring (PSR) needs precise timing to ensure successful extraction of the bunched protons. The current control system¿s hardware is obsolete and unmaintainable. The task was to replace the 1980¿s era CAMAC control and timing system for the PSR extraction kickers. This included a system which halts charging of the kickers after a duration without firing to prevent equipment damage. A hybrid approach was taken to integrate a Berkeley Nucleonics Corporation (BNC) pulse generator that was controlled by a soft input/output controller (IOC) and National Instrument compact Reconfigurable Input/Output (cRIO) IOC. This allowed for flexibility and modularity of the software and hardware development. This approach built the framework to streamline robust deployment of hybrid systems and develop a solution for upgrades of other LANSCE kickers.
 
poster icon Poster TUP029 [0.679 MB]  
DOI • reference for this paper ※ doi:10.18429/JACoW-IBIC2023-TUP029  
About • Received ※ 06 September 2023 — Revised ※ 08 September 2023 — Accepted ※ 13 September 2023 — Issue date ※ 18 September 2023
Cite • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
WEP042 Implementation of Transimpedance Analog Front-End Card for Los Alamos Neutron Science Center Accelerator Wire Scanners 442
 
  • D. Rai, S.A. Baily, A.J. Braido, J.I. Duran, L.S. Kennel, H.L. Leffler, D. Martinez, L.S. Montoya, D.D. Zimmermann
    LANL, Los Alamos, New Mexico, USA
 
  Funding: Work supported by the U.S. Department of Energy, contract no. 89233218CNA000001. LA-UR-23-25123
The Los Alamos Neutron Science Center’s (LANSCE) Accelerator Operations and Technology division group executed a project that implemented a new analog front-end card (AFE) for their wire scanner’s Data Acquisition (DAQ) system. The AFE accommodates the signal amplification and noise reduction needed to acquire essential measurement data for beam diagnostics for the LANSCE accelerator. Wire Scanners are electro-mechanical beam interceptive devices that provide cross-sectional beam profile measurement data fitted to a Gaussian distribution that provides beam shape and position information. The beam operators use the beam shape and position information to adjust parameters such as acceleration, steering and focus on delivering an optimized beam to all targets. The project implemented software and hardware that eliminated the dependency on legacy systems and consolidated various AFE designs for diagnostics systems into a single design with 11 gain settings ranging from 100 nA to 40 mA at 10 V full scale to accommodate future applications on other diagnostic systems.
 
poster icon Poster WEP042 [2.193 MB]  
DOI • reference for this paper ※ doi:10.18429/JACoW-IBIC2023-WEP042  
About • Received ※ 07 September 2023 — Revised ※ 10 September 2023 — Accepted ※ 13 September 2023 — Issue date ※ 27 September 2023
Cite • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)