Status of the JAEA-ADS Superconducting LINAC Design
30
B. Yee-Rendón, Y. Kondo, F. Maekawa, S.I. Meigo, J. Tamura
JAEA/J-PARC, Tokai-mura, Japan
The Japan Atomic Energy Agency (JAEA) is working in the research and development of an Accelerator Driven Subcritical System (ADS) for the transmutation of nuclear waste. To this end, JAEA is designing a 30-MW cw proton linear accelerator (linac) with a beam current of 20 mA. The JAEA-ADS linac starts with a Normal Conducting (NC) up to an energy of 2.5 MeV. Then, five Superconducting (SC) sections accelerate the beam up to 1.5 GeV. The biggest challenge for this ADS linac is the stringent reliability required to avoid thermal stress in the subcritical reactor, which is higher than the achieved in present accelerators. For this purpose, the linac pursues a strong-stable design that ensures the operation with low beam loss and fault-tolerance capabilities to continue operating in case of failure. This work presents the beam dynamics results toward achieving high reliability for the JAEA-ADS linac.
Right click on video for Picture-in-Picture mode or Full screen display.
A. Gatera, J. Belmans, S. Boussa, F. Davin, W. De Cock, V.R.A. De florio, F. Doucet, L. Parez, F. Pompon, A. Ponton, D. Vandeplassche, E. Verhagen
SCK•CEN, Mol, Belgium
Dr. Ben Abdillah, C. Joly, L. Perrot
Université Paris-Saclay, CNRS/IN2P3, IJCLab, Orsay, France
F. Bouly, E. Froidefond, A. Plaçais
LPSC, Grenoble Cedex, France
H. Podlech
IAP, Frankfurt am Main, Germany
J. Tamura
JAEA/J-PARC, Tokai-mura, Japan
C. Zhang
GSI, Darmstadt, Germany
The MYRRHA project at SCK•CEN, Belgium, aims at coupling a 600 MeV proton accelerator to a subcritical fission core operating at a thermal power of 60 MW. The nominal proton beam for this ADS has an intensity of 4 mA and is delivered in a quasi-CW mode. MYRRHA’s linac is designed to be fault tolerant thanks to redundancy implemented in parallel at low energy and serially in the superconducting linac. Phase 1 of the project, named MINERVA, will realise a 100 MeV, 4 mA superconducting linac with the mission of demonstrating the ADS requirements in terms of reliability and of fault tolerance. As part of the reliability optimisation program the integrated prototyping of the MINERVA injector is ongoing at SCK•CEN in Louvain-la-Neuve, Belgium. The injector test stand aims at testing sequentially all the elements composing the front-end of the injector. This contribution will highlight the beam dynamics choices in MINERVA’s injector and their impact on ongoing commissioning activities. *angelique.gatera@sckcen.be
Right click on video for Picture-in-Picture mode or Full screen display.