Discussion on SARAF-LINAC Cryomodules |
cavity, linac, controls, solenoid |
80 |
|
- N. Pichoff
CEA/IRFU, Gif-sur-Yvette, France
- D. Chirpaz-Cerbat, R. Cubizolles, J. Dumas, R.D. Duperrier, G. Ferrand, B. Gastineau, F. Leseigneur, C. Madec, Th. Plaisant, J. Plouin
IRFU, CEA, University Paris-Saclay, Gif-sur-Yvette, France
|
|
|
CEA is in charge of the design, construction, installation and commissioning at SNRC of the Linac of the SARAF project. The linac is composed of an MEBT and a Superconducting linac (SCL) integrating 4 cryomodules. Nowadays, the HWR cavities and superconducting magnets prototypes are being built. The Critical Design Review of the cryomodules has just been passed in March 2018. This paper present the status of the SARAF-LINAC cryomodules.
|
|
|
Slides TUA2WC01 [14.245 MB]
|
|
DOI • |
reference for this paper
※ https://doi.org/10.18429/JACoW-HB2018-TUA2WC01
|
|
Export • |
reference for this paper using
※ BibTeX,
※ LaTeX,
※ Text/Word,
※ RIS,
※ EndNote (xml)
|
|
|
WEP2PO016 |
Temperature Measurement of Cryomodules |
cavity, PLC, controls, superconducting-cavity |
299 |
|
- H. Kim, J.W. Choi, Y.W. Jo, H.C. Jung, Y. Jung, J.W. Kim, M.S. Kim, Y. Kim, M. Lee
IBS, Daejeon, Republic of Korea
|
|
|
A quarter-wave resonator (QWR) and a half-wave resonator (HWR) cryomodules and the control systems such as programmable logic controller (PLC) are developed. Temperature sensors such as Cernox-1050 are calibrated and applied to the cryomodules. Preparation of vertical test is introduced. QWR and HWR cryomodules are fabricated and tested by using the developed PLC control system. The PLC rack and temperature monitors are shown and the human machine interfaces (HMI) screen is shown when the HWR cryomodules is tested at 2 K.
|
|
DOI • |
reference for this paper
※ https://doi.org/10.18429/JACoW-HB2018-WEP2PO016
|
|
Export • |
reference for this paper using
※ BibTeX,
※ LaTeX,
※ Text/Word,
※ RIS,
※ EndNote (xml)
|
|
|