Paper |
Title |
Page |
WEP2PO023 |
Timing Adjustment of Eight Kickers and a Method to Calibrate the Kicker Current Curves During the Beam Commissioning for CSNS |
312 |
|
- M.Y. Huang, D.P. Jin, L. Shen, S. Wang, S.Y. Xu, P. Zhu
IHEP, Beijing, People's Republic of China
|
|
|
The extraction system is a key part of the China Spallation Neutron Source (CSNS) accelerator. It consists of two kinds of magnets: eight kickers and one lambertson. During the beam commissioning, the timing adjustment of eight kickers is a very important problem. In the paper, the methods to adjust the timing of eight kickers will be studied and applied to the beam commissioning. Then, the best method to adjust the timing of eight kickers will be given and used for a long time in the future.
|
|
|
Poster WEP2PO023 [1.027 MB]
|
|
DOI • |
reference for this paper
※ https://doi.org/10.18429/JACoW-HB2018-WEP2PO023
|
|
Export • |
reference for this paper using
※ BibTeX,
※ LaTeX,
※ Text/Word,
※ RIS,
※ EndNote (xml)
|
|
|