Author: Eshraqi, M.
Paper Title Page
TUA1WC02
Recent Progress on the ESS Project  
 
  • M. Eshraqi
    ESS, Lund, Sweden
 
  The European Spallation Source, ESS, will be the world's brightest neutron source driven by the highest power linac, when it enters into operations. Different parts of the 5 MW ESS linac are being installed in Lund, Sweden and beam commissioning of the source is planned for early summer this year. This contribution will present a summary of the status of the project, including progress in the design, manufacturing and testing of different beam line components of the linac.  
slides icon Slides TUA1WC02 [3.422 MB]  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
TUA1WD01 ESS Commissioning Plans 127
 
  • N. Milas, R. De Prisco, M. Eshraqi, Y. Levinsen, R. Miyamoto, M. Muñoz, D.C. Plostinar
    ESS, Lund, Sweden
 
  The ESS linac is currently under construction in Lund, Sweden, and once completed it will deliver an unprecedented 5 MW of average power. The ion source and LEBT commissioning starts in 2018 and will continue with the RFQ, MEBT and the first DTL tank next year and up to the end of the fourth DTL tank in 2020. This paper will summarize the commissioning plans for the normal conducting linac with focus on the ion source and LEBT and application development for both commissioning and operation.  
slides icon Slides TUA1WD01 [1.552 MB]  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-HB2018-TUA1WD01  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
WEP1WB01 Beam Dynamics of the ESS Linac 206
 
  • Y. Levinsen, R. De Prisco, M. Eshraqi, N. Milas, R. Miyamoto, D.C. Plostinar, A. Ponton
    ESS, Lund, Sweden
 
  The ESS linac will deliver an unprecedented 5 MW of average beam power when completed. Beyond the 90 MeV normal conducting front-end, the acceleration is performed using SC structures up to the design energy of 2 GeV. As the ESS will send the beam to a fixed tungsten target, the emittance is not as important a factor as in injectors. However, the losses have to be studied in detail, including not only the average operational loss required to be of less than 1 W/m, but also the accidental losses, losses due to failure and other potentially damaging losses. The commissioning of the ion source and LEBT starts this year and will continue with the RFQ next year. In this contribution we will discuss the beam dynamics aspects and challenges of the ESS linac.  
slides icon Slides WEP1WB01 [2.084 MB]  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-HB2018-WEP1WB01  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)