Paper |
Title |
Other Keywords |
Page |
TU3B3 |
Pyapas: A New Framework for High Level Application Development at HEPS |
framework, linac, booster, controls |
77 |
|
- X.H. Lu
IHEP CSNS, Guangdong Province, People’s Republic of China
- D. Ji, H.F. Ji, Y. Jiao, J.Y. Li, N. Li, C. Meng, Y.M. Peng, J. Wan, Y. Wei, G. Xu, H.S. Xu, Y.L. Zhao
IHEP, Beijing, People’s Republic of China
|
|
|
The development of high-level application (HLA) is an indispensable part of the light source construction process. With the increase in the scale and complexity of accelerators, the development of HLA will also face many new challenges, such as increased data volume, multiple data types, more parameter channels, and more complex tuning algorithms. So a new framework named Pyapas has been designed for HLA development which aims to provide a high-performance, scalable, flexible, and reliable HLA development framework to meet the needs of large-scale parameter tuning and data processing. Pyapas is designed with a modular concept, decomposing the development needs of HLA into different modules for decoupled development, and calling them through simple interfaces. In the communication module, a singleton factory class is designed to avoid duplicate creation of channel connections, and combined with Qt’s signal-slot mechanism to create non-blocking communication connections, greatly improving the carrying capacity of parameter scale. While a deeply decoupled two-layer physical model module is designed to quickly switch different mathematical models to meet different online computing needs. Moreover, the design of the C/S architecture development module and the rapid creation and management module of the database is helpful for quickly developing complex programs, further enhancing the applicability of Pyapas. This paper will introduce the main feature of Pyapas
|
|
|
Slides TU3B3 [6.913 MB]
|
|
DOI • |
reference for this paper
※ doi:10.18429/JACoW-FLS2023-TU3B3
|
|
About • |
Received ※ 30 August 2023 — Revised ※ 31 August 2023 — Accepted ※ 01 September 2023 — Issued ※ 02 December 2023 |
Cite • |
reference for this paper using
※ BibTeX,
※ LaTeX,
※ Text/Word,
※ RIS,
※ EndNote (xml)
|
|
|
TU4P08 |
Design and Commissioning of the Beam Switchyard for the SXFEL-UF |
FEL, emittance, linac, undulator |
91 |
|
- S. Chen, K.Q. Zhang
SSRF, Shanghai, People’s Republic of China
- H.X. Deng, C. Feng, B. Liu, T. Liu, Z. Qi, Z.T. Zhao
SARI-CAS, Pudong, Shanghai, People’s Republic of China
|
|
|
As an important measure of improving the efficiency and usability of X-ray free electron laser facilities, parallel operation of multiple undulator lines realized by a beam switchyard has become a standard configuration in the recent built XFEL facilities. SXFEL-UF, the first soft X-ray free electron laser user facility in China, has finished construction and commissioning recently. The electron beams from the linac are separated and delivered alternately to the two parallel undulator beam lines through a beam switchyard. A stable and fast kicker magnet is used to achieve bunch-by-bunch separation. Optics measures are applied to mitigate the impact of various collective effects, such as coherent synchrotron radiation and micro-bunching instability, on the beam quality after passing through the deflection line of the beam switchyard. In this study, the comprehensive physical design of the beam switchyard is described and the latest results of its commissioning process are presented.
|
|
|
Poster TU4P08 [4.643 MB]
|
|
DOI • |
reference for this paper
※ doi:10.18429/JACoW-FLS2023-TU4P08
|
|
About • |
Received ※ 23 August 2023 — Revised ※ 30 August 2023 — Accepted ※ 31 August 2023 — Issued ※ 02 December 2023 |
Cite • |
reference for this paper using
※ BibTeX,
※ LaTeX,
※ Text/Word,
※ RIS,
※ EndNote (xml)
|
|
|
TU4P20 |
Simulated Commissioning for Diamond-II Storage Ring from On-axis to Off-axis Injection |
quadrupole, closed-orbit, simulation, injection |
124 |
|
- H.-C. Chao, I.P.S. Martin
DLS, Oxfordshire, United Kingdom
|
|
|
The Diamond-II storage ring commissioning simulations have continued based on the previous results where on-axis injected beams are captured. The next goal is to enlarge the dynamic aperture so that off-axis injection can be achieved. The procedures include beam based alignment, beta-beating correction and linear optics correction. Details of the implementations are discussed and the simulation results are presented. In the end, we are able to reach off-axis injection which allows accumulation.
|
|
DOI • |
reference for this paper
※ doi:10.18429/JACoW-FLS2023-TU4P20
|
|
About • |
Received ※ 22 August 2023 — Revised ※ 30 August 2023 — Accepted ※ 31 August 2023 — Issued ※ 02 December 2023 |
Cite • |
reference for this paper using
※ BibTeX,
※ LaTeX,
※ Text/Word,
※ RIS,
※ EndNote (xml)
|
|
|
TU4P27 |
Progress of the HEPS Accelerator Construction and Linac Commissioning |
linac, booster, storage-ring, photon |
131 |
|
- C. Meng, J.S. Cao, Z. Duan, D.Y. He, P. He, H.F. Ji, Y. Jiao, W. Kang, J. Li, J.Y. Li, W.M. Pan, Y.M. Peng, H. Qu, S.K. Tian, G. Xu, H.S. Xu, J. Zhang, J.R. Zhang
IHEP, Beijing, People’s Republic of China
- X.H. Lu
IHEP CSNS, Guangdong Province, People’s Republic of China
|
|
|
The High Energy Photon Source (HEPS) is the first fourth-generation synchrotron radiation source in China that has been on the track for construction. The accelerator complex of the light source is composed of a 7BA storage ring, a booster injector, a Linac pre-injector, and three transfer lines. In order to provide high-bunch-charge beams for the storage ring, the booster was designed to be capable of both beam acceleration from low injection energy to extraction energy and charge accumulation at the extraction energy by means of accepting electron bunches from the storage ring. The Linac was built using S-band normal conducting structures, and can provide electron beam with pulse charge up to 7 nC. This paper reports the progress of the construction of the accelerators, including the installation of the storage ring, the pre-commissioning tests of the booster, and commissioning of the Linac. In particular, the beam commissioning of the Linac will be introduced in detail.
|
|
DOI • |
reference for this paper
※ doi:10.18429/JACoW-FLS2023-TU4P27
|
|
About • |
Received ※ 29 August 2023 — Revised ※ 29 August 2023 — Accepted ※ 30 August 2023 — Issued ※ 02 December 2023 |
Cite • |
reference for this paper using
※ BibTeX,
※ LaTeX,
※ Text/Word,
※ RIS,
※ EndNote (xml)
|
|
|
WE4P12 |
Upgrades of High Level Applications at Shanghai Soft X-Ray FEL Facility |
FEL, electron, feedback, laser |
171 |
|
- H. Luo, D. Gu, T. Liu, Z. Wang
SARI-CAS, Pudong, Shanghai, People’s Republic of China
- K.Q. Zhang
SSRF, Shanghai, People’s Republic of China
|
|
|
The Shanghai soft X-ray free-electron laser(SXFEL) facility has made significant progress in recent years with the rapid, upgraded iterations of the high level software, including but not limited to energy matching, orbit feedback and load, beam optimization, etc. These tools are key components in operation and experiment of free electron laser facility. Some key applications are presented in this paper.
|
|
DOI • |
reference for this paper
※ doi:10.18429/JACoW-FLS2023-WE4P12
|
|
About • |
Received ※ 21 August 2023 — Revised ※ 29 August 2023 — Accepted ※ 30 August 2023 — Issued ※ 02 December 2023 |
Cite • |
reference for this paper using
※ BibTeX,
※ LaTeX,
※ Text/Word,
※ RIS,
※ EndNote (xml)
|
|
|
WE4P36 |
The Cryogenic Undulator Upgrade Programme at Diamond Light Source |
vacuum, undulator, cryogenics, insertion-device |
211 |
|
- Z. Patel, W. Cheng, A. George, S.H. Hale, R. Mercado, A. Ramezani Moghaddam, M. Reeves, G. Sharma, S. Tripathi
DLS, Oxfordshire, United Kingdom
- M.V. Marziani
University of Cape Town, Cape Town, South Africa
|
|
|
Diamond Light Source has installed four 2 m long, 17.6 mm period Cryogenic Permanent Magnet Undulators (CPMUs) as upgrades for crystallography beamlines since 2020, with two more planned within the next year. The CPMUs provide 2 - 3 times more brightness and 2 - 4 times more flux than the pure permanent magnet (PPM) devices they are replacing. They have been designed, built, and measured in-house. All four have a 4 mm minimum operating gap and are almost identical in their construction: the main difference being an increase in the number of in-vacuum magnet beam support points from four to five, between CPMU-1 and CPMUs 2 - 4, to better facilitate shimming, particularly at cold temperatures. The ability to shim at cryogenic temperatures necessitated the development of an in-vacuum measurement system. The details of the measurement system will be presented alongside the mechanical and cryogenic design of the undulators; including issues with the magnet foils, and the shimming procedures and tools used to reach the tight magnetic specifications at room temperature and at 77 K.
|
|
|
Poster WE4P36 [1.656 MB]
|
|
DOI • |
reference for this paper
※ doi:10.18429/JACoW-FLS2023-WE4P36
|
|
About • |
Received ※ 23 August 2023 — Revised ※ 29 August 2023 — Accepted ※ 31 August 2023 — Issued ※ 02 December 2023 |
Cite • |
reference for this paper using
※ BibTeX,
※ LaTeX,
※ Text/Word,
※ RIS,
※ EndNote (xml)
|
|
|