Paper | Title | Page |
---|---|---|
MOA05 |
First Lasing at SXFEL | |
|
||
Shanghai soft X-ray free-electron laser (SXFEL) started its construction in December of 2014. After years of effort, first lasing at 8.8 nm with designed cascading mode is finally achieved in 2019. The commissioning progress and recent results will be reported. | ||
![]() |
Slides MOA05 [9.952 MB] | |
Export • | reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml) | |
FRA04 |
Status of SXFEL Test and User Facilities | |
|
||
Shanghai soft X-ray Free-Electron Laser facility (SXFEL) is being developed in two steps, the test facility SXFEL-TF and the user facility SXFEL-UF. The SXFEL-TF, as a critical development step towards constructing a soft X-ray FEL user facility in China, is under commissioning at the SSRF campus. In the meantime, the SXFEL-UF with designed wavelength in the water window region is being constructed, based on upgrading the SXFEL linac energy to 1.5 GeV and building two undulator lines and five experimental stations. In this paper, we report the construction and commissioning status and future plan of the SXFEL facility. | ||
![]() |
Slides FRA04 [24.201 MB] | |
Export • | reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml) | |