A   B   C   D   E   F   G   H   I   J   K   L   M   N   O   P   Q   R   S   T   U   V   W   X   Y   Z  

Uesugi, T.

Paper Title Page
TUOBM04 FFAGs for the ERIT and ADS Projects at KURRI 1013
 
  • T. Uesugi, H. Horii, Y. Kuriyama, K. Mishima, Y. Mori, A. Osanai, T. Planche, S. Shiroya, M. Tanigaki, H. Yoshino
    KURRI, Osaka
  • M. Inoue
    SLLS, Shiga
  • Y. Ishi
    Mitsubishi Electric Corp, Energy & Public Infrastructure Systems Center, Kobe
  • M. Muto
    FFAG DDS Research Organization, Tokyo
  • K. Okabe, I. Sakai
    University of Fukui, Faculty of Engineering, Fului
 
  A chain of FFAG proton accelerator have been under construction at Kyoto University Research Reactor Institute (KURRI), Osaka, for the study of accelerator driven system (ADS) since 2004. The accelerator is a cascade type and composed of three different FFAG rings: injector, booster and main ring. The maximum energy of the main ring is 150 MeV for proton. The beam was successfully accelerated and extracted from the booster in June of 2006 and the beam commissioning of the main ring has started since then. Recently the beam has been successfully injected into the main ring.  
slides icon Slides