MOAO02 |
The Commissioning of a 230 MeV Superconducting Cyclotron CYCIAE-230 |
15 |
|
- C. Wang, H.R. Cai, W.F. Fu, A.L. He, M.Z. Hu, B. Ji, L.Y. Ji, X.L. Jia, Y. Jia, T.Y. Jiang, J. Liu, J.Y. Liu, P. Liu, Z.W. Liu, X. Mu, S. Pei, G.F. Song, Q.Q. Song, F. Wang, J.Y. Wei, L.P. Wen, J.S. Xing, Z.G. Yin, D.Z. Zhang, S.P. Zhang, T.J. Zhang, X. Zheng, H. Zhou, P.F. Zhu, X.F. Zhu
CIAE, Beijing, People’s Republic of China
|
|
|
There are very strong demands for proton accelera-tors in medium energy range in recent years due to the fast growth of proton therapy and the space science in China. For the applications of proton therapy and pro-ton irradiation, the energy range of proton beam is usually from 200MeV to 250MeV, or even higher for astronavigation [1]. An R&D project for constructing a 230MeV superconducting cyclotron (CYCIAE-230) has been initiated at China Institute of Atomic Energy (CIAE) since Jan 2015. In July of 2016, after the fund-ing was approved by China National Nuclear Corpora-tion (CNNC), the construction project was fully launched. In Dec 2019, the superconducting main magnet and the RF system were transferred to the new-ly built commissioning site. Then, the RF commission-ing, ion source and central region test were performed even during the pandemic in early 2020. In September 2020, after finishing the commissioning tests of all subsystems, the beam was reached the extraction channel but with very low efficiency. Since then, with more efforts on beam diagnostics, the fine tuning of the beam phase and the adjusting of the superconduct-ing coil have been proven to be useful to get higher beam extraction efficiency ~55%. In this paper, the commissioning of the key components, including the main magnet, SC coils, internal ion source and central region, extraction system, etc, as well as the commis-sioning progress of the machine CYCIAE-230 will be presented.
|
|
|
Slides MOAO02 [10.305 MB]
|
|
DOI • |
reference for this paper
※ doi:10.18429/JACoW-CYCLOTRONS2022-MOAO02
|
|
About • |
Received ※ 24 January 2023 — Revised ※ 25 January 2023 — Accepted ※ 09 February 2023 — Issue date ※ 10 June 2023 |
Cite • |
reference for this paper using
※ BibTeX,
※ LaTeX,
※ Text/Word,
※ RIS,
※ EndNote (xml)
|
|
|
WEPO017 |
A New Design of CYCIAE230 Superconducting Cyclotron RF-Driven System |
237 |
|
- Z.G. Yin, X.L. Fu, B. Ji, X. Mu, S. Pei, J.Y. Wei, T.J. Zhang
CIAE, Beijing, People’s Republic of China
|
|
|
A superconducting cyclotron with a beam energy of 246.2MeV has been developed and commissioned by the China Institute of Atomic Energy. The RF system of the first CYCIAE-230 cyclotron adopts two tetrode amplifiers to drive the cavities simultaneously. The driven power is 180 degrees out of phase and each of the amplifiers was designed able to deliver 75kW RF power to the cavities. In practice, it was found that the driven power is beyond necessary and only 80kW RF power is required for the beam. Hence, an upgrade of the existing RF-driven system to the stare-of-art of solid-state technology is put forward by the CIAE cyclotron team. Furthermore, this alternative design also includes an optimization of the coupling between amplifiers and the cavities, since the old coupler shows nonidealities under long-term high-power operations. A driven schema utilizing multiple low-power capacitive couplers is designed to address this issue, taking advantage of the cavity as a power combiner. In this paper, a review of the existing RF-driven system will be given first. It will be followed by an analysis of the limitation of such a system in practice. A new design of the solid amplifier, the new driven method, and a capacitive window will also be reported.
|
|
DOI • |
reference for this paper
※ doi:10.18429/JACoW-CYCLOTRONS2022-WEPO017
|
|
About • |
Received ※ 25 December 2022 — Revised ※ 29 January 2023 — Accepted ※ 09 February 2023 — Issue date ※ 02 June 2023 |
Cite • |
reference for this paper using
※ BibTeX,
※ LaTeX,
※ Text/Word,
※ RIS,
※ EndNote (xml)
|
|
|
THPO007 |
Direct Sampling Digital Low-Level RF Control for CIAE BNCT Cyclotron |
311 |
|
- X. Mu, J.Y. Wei, Z.G. Yin
CIAE, Beijing, People’s Republic of China
- X.L. Fu
TRIUMF, Vancouver, Canada
|
|
|
Boron Neutron Capture Therapy "BNCT" can be delivered using a high current cyclotron, resulting more compact and environmentally friendly design, yet the difficulties remain in the cyclotron part, particularly in RF systems. The high beam loading challenges the stability of the amplifiers, as well as the control loops. Especially in our case, the wall loss of each cavity is more than the beam-loading power of the CIAE BNCT cyclotron. To address the heavy beam loading coefficient, a higher-performance ADRC control algorithm is evaluated, together with the regular PID control. In the meantime, a direct sampling/synthesizing digital low-level RF control hardware design is put forward to have more flexibility in control implementation. Since this new design adopts Xilinx SOC as the main controller, it is convenient to combine real-time control algorithm with high-level control through Advanced Extensible Interface. In this LLRF design, the amplitude and phase control using PID control is implemented in the PS end, and the tuning control is taking advantage of the ADRC algorithm in the PL end. Using a symmetrical design, together with the buncher control, in total, regulation of three loops are achieved using two control boards. The software/hardware design as well as the commission result will be reported in this paper.
|
|
|
Poster THPO007 [2.567 MB]
|
|
DOI • |
reference for this paper
※ doi:10.18429/JACoW-CYCLOTRONS2022-THPO007
|
|
About • |
Received ※ 29 December 2022 — Revised ※ 21 January 2023 — Accepted ※ 31 January 2023 — Issue date ※ 01 April 2023 |
Cite • |
reference for this paper using
※ BibTeX,
※ LaTeX,
※ Text/Word,
※ RIS,
※ EndNote (xml)
|
|
|