Paper | Title | Other Keywords | Page |
---|---|---|---|
TUP14 | Investigation on the Suppression of Intrabeam Scattering in the High Intensity Heavy Ion Beam with the help of Longitudinal Multi-bunch Chain of Electron | ion, electron, scattering, experiment | 58 |
|
|||
Intrabeam scattering is the main reason of degradation of the beam brightness and shortening of brightness lifetime in the collider, light source and storage ring. The intrabeam scattering presents dissimilar influence in the different facilities. Electron cooling was chose to suppress the effect of intrabeam scattering, another unexpected effect happened during the cooling. The distribution of ion beam quickly deviates from the initial Gaussian type, form a denser core and long tail. The ions standing in the tail of beam will loss soon due to large amplitude. This solution will focus on the investigation on the suppression of intrabeam scattering in the high intensity heavy ion beam in the storage ring with the help of longitudinally modulated electron beam. The stronger cooling was expected in the tail of ion beam and the weaker cooling was performed in the tail of ion beam. The particle in the outside will experience stronger cooling and will be driven back into the centre of ion beam. The ion loss will be decreased and the lifetime will be increased. The intensity of ion beam in the storage ring will be kept and maintain for long time. | |||
Poster TUP14 [4.160 MB] | |||
DOI • | reference for this paper ※ https://doi.org/10.18429/JACoW-COOL2017-TUP14 | ||
Export • | reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml) | ||
TUP15 | Experimental Demonstration of Electron Cooling with Bunched Electron Beam | electron, ion, experiment, proton | 61 |
|
|||
Funding: This work was supported by the Hundred Talents Project of the Chinese Academy of Sciences and National Natural Science Foundation of China (Nos. 11575264, 11475235, 11375245) Electron cooling at high energy is presently considered for several ion colliders, in order to achieve high luminosities by enabling a significant reduction of emittance of hadron beams. Electron beam at cooling channel in a few to tens MeV can be accelerated by a RF/SRF linac, and thus using bunched electrons to cool bunched ions. To study such cooling process, the DC electron gun of EC35 cooler was modified by pulsing the grid voltage, by which a 0.5-3.5 us of electron bunch length with a repetition frequency of less than 250 kHz was obtained. The first experiment demonstrated cooling coasting and bunched ion beam by a bunched electron beam was carried out at the storage ring CSRm at IMP. A preliminary data analysis has indicted the bunch length shrinkage and the momentum spread reduction of bunched 12C+6 ion beam. A longitudinal grouping effect of coasting ion beam by the electron bunch has also observed. In this paper, we will present the experiment result and its preliminary comparison to the simulation modeling. |
|||
DOI • | reference for this paper ※ https://doi.org/10.18429/JACoW-COOL2017-TUP15 | ||
Export • | reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml) | ||
THM13 | Commissioning of the Low Energy Storage Ring Facility CRYRING@ESR | ion, MMI, injection, proton | 81 |
|
|||
CRYRING@ESR is the early installation of the low-energy storage ring LSR, a Swedish in kind contribution to FAIR, which was proposed as the central decelerator ring for antiprotons at the FLAIR facility. An early installation opens the opportunity to explore part of the low energy atomic physics with heavy, highly charged ions as proposed by the SPARC collaboration but also experiments of nuclear physics background much sooner than foreseen in the FAIR general schedule. Furthermore, the ring follows in large parts FAIR standards, and is used to test the FAIR control system. CRYRING@ESR has been installed behind the existing experimental storage ring ESR starting in 2013. It has a local injector that is used for commissioning. In November 2016 the commissioning of the storage ring started and a first turn was achieved. After a complete bake out cycle and substantial developments of control system, diagnosis and others, commissioning was continued in late summer 2017. Stored as well as accelerated beam has been achieved by now. The remaining step is to take the electron cooler into operation, which is planned for November this year. | |||
Slides THM13 [4.318 MB] | |||
DOI • | reference for this paper ※ https://doi.org/10.18429/JACoW-COOL2017-THM13 | ||
Export • | reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml) | ||