Paper | Title | Page |
---|---|---|
TUPB014 | First Operation of a Superconducting RF Electron Test Accelerator at Fermilab | 571 |
|
||
Funding: Operated by Fermi Research Alliance, LLC under Contract No. DE-AC02-07CH11359 with the United States Department of Energy. A test accelerator utilizing SRF technology recently accelerated its first electrons to 20 MeV at Fermilab. Foreseen enhancements will make acceleration to 300 MeV possible at a maximum beam power of 80 kW. A summary of commissioning steps and first experiments as well as current beam parameters compared to design is presented. Plans for expansion and the future physics program are also summarized. |
||
![]() |
Poster TUPB014 [11.582 MB] | |
Export • | reference for this paper to ※ BibTeX, ※ LaTeX, ※ Text, ※ RIS/RefMan, ※ EndNote (xml) | |
FRAA03 | High Gradient Performance in Fermilab ILC Cryomodule | 1432 |
|
||
Funding: Operated by Fermi Research Alliance, LLC under Contract No. DE-AC02-07CH11359 with the United States Department of Energy. Fermilab has assembled an ILC like cryomodule using U.S. processed high gradient cavities and achieved an average gradient of 31.5 MV/m for the entire cryomodule. Test results and challenges along the way will be discussed. |
||
![]() |
Slides FRAA03 [5.878 MB] | |
Export • | reference for this paper to ※ BibTeX, ※ LaTeX, ※ Text, ※ RIS/RefMan, ※ EndNote (xml) | |