Author: Machicoane, G.
Paper Title Page
WEOAB1 Status of the FRIB Front End 734
 
  • E. Pozdeyev, N.K. Bultman, G. Machicoane, G. Morgan, X. Rao, Q. Zhao
    FRIB, East Lansing, Michigan, USA
 
  Funding: Work supported by the U.S. Department of Energy Office of Science under Cooperative Agreement DE-SC0000661
The FRIB Front End will provide beams of stable ions with a mass up to uranium at a beam energy of 500 keV/u and intensity required to achieve a power of 400 kW on the fragmentation target. In this paper, we describe progress with the design and construction of the Front End and its systems.
 
slides icon Slides WEOAB1 [5.861 MB]  
 
FRYBA1 Progress towards the Facility for Rare Isotope Beams 1453
 
  • J. Wei, N.K. Bultman, F. Casagrande, C. Compton, K.D. Davidson, J. DeKamp, B. Drewyor, K. Elliott, A. Facco, P.E. Gibson, T . Glasmacher, K. Holland, M.J. Johnson, S. Jones, D. Leitner, M. Leitner, G. Machicoane, F. Marti, D. Morris, J.A. Nolen, J.P. Ozelis, S. Peng, J. Popielarski, L. Popielarski, E. Pozdeyev, T. Russo, K. Saito, J.J. Savino, R.C. Webber, M. Williams, T. Xu, Y. Yamazaki, A. Zeller, Y. Zhang, Q. Zhao
    FRIB, East Lansing, USA
  • D. Arenius, V. Ganni
    JLAB, Newport News, Virginia, USA
  • A. Facco
    INFN/LNL, Legnaro (PD), Italy
  • R.E. Laxdal
    TRIUMF, Canada's National Laboratory for Particle and Nuclear Physics, Vancouver, Canada
  • J.A. Nolen
    ANL, Argonne, USA
 
  Funding: Work supported by the U.S. Department of Energy Office of Science under Cooperative Agreement DE-SC0000661
The Facility for Rare Isotope Beams (FRIB) is based on a continuous-wave superconducting heavy ion linac to accelerate all the stable isotopes to above 200 MeV/u with a beam power of up to 400 kW. At an average beam power approximately two-to-three orders-of-magnitude higher than those of operating heavy-ion facilities, FRIB stands at the power frontier of the accelerator family - the first time for heavy-ion accelerators. To realize this innovative performance, superconducting RF cavities are used starting at the very low energy of 500 keV/u, and beams with multiple charge states are accelerated simultaneously. Many technological challenges specific for this linac have been tackled by the FRIB team and collaborators. Furthermore, the distinct differences from the other types of linacs at the power front must be clearly understood to make the FRIB successful. This report summarizes the technical progress made in the past years to meet these challenges.