Paper | Title | Page |
---|---|---|
TUP011 | Observations of Two Microbunches After a 180-Degree Arc Section at the KEKB Linac | 410 |
|
||
The KEKB linac continuously injects 8 GeV electron and 3.5 GeV positron beams into the KEKB rings: HER(high energy ring) and LER(low energy ring). The energy spread of the 8-GeV electron beam, which is accelerated to an 1.7 GeV 180-degree arc section and reaccelerated after this arc to a final energy of 8 GeV, is optimized by adjusting rf acceleration phases so as to assure efficient injections. When rf phases are slightly changed or drifted for some reasons, the beam not only shows larger energy spreads but also indicates two clusters on a beam profile monitor located at large energy dispersions. In this connection, a longitudinal beam profile was measured after the arc section with a streak-camera system utilizing an OTR(Optical Transition Radiation) bunch monitor. The observed bunch shape clearly shows a two-microbunch structure, suggesting that it could be generated in the arc section. Various experimental data as well as some CSR-related speculations are presented. |
||
THP053 | The Status of Nextef; The X-band Test Facility in KEK | 906 |
|
||
Nextef is a new X-band (11.4GHz) test facility in KEK. All of the key devices of this facility are from our old X-band Test Facility(XTF). By combining the power from two klystrons, 100 MW maximum X-band rf power is produced and 75MW is available in the bunker where the high power test of the high gradient accelerator structures will be done. The commissioning of the facility for the structure testing has almost done. The status of the facilityis is reported. |
||
THP086 | Cold Cathode Electron Tube Toward Plenty Multi Beam Tube | 990 |
|
||
The multi beam electron tube with a lot of beam pipes is required for the low applied voltage and the high frequency because the efficiency has a limit according to the perveance. However, the total heater power becomes too high if many thermal cathodes are used. Thus the cold cathode such as the carbon nano tube (CNT) is suitable for such a multi beam electron tube. Further the cold cathode has the advantage to work as a switching device since the metal grid close to the cathode can be used. The design and the fundamental test of the partial model will be presented. |
||
THP106 | High Speed Data Acquisition System Using FPGA for LLRF Measurement and Control | 1042 |
|
||
Recently, FPGA technology is widely used for the accelerator control owing to its fast digital processing. We have been developing several applications for LLRF control and measurement using commercial and custom-made FPGA board. XtremeDSP(the commercial FPGA board equipped two ADCs and two DACs) is mainly used for the performance evaluation of STF(Superconducting RF Test Facility) LLRF. Installing the custom-made FPGA board equipped with ten ADCs and two DACs is considering for up-grade of the rf driver and rf monitoring system in the injector linac. Development of the high-speed data acquisition system that combines commercial FPGA board ML555 and FastADC(ADS5474 14bit, 400MS/s) is carried out. Result of those data acquisition systems will be summarized. |
||
THP054 | Status of RF Sources in Super-Conducting RF Test Facility (STF) at KEK | 909 |
|
||
Phase 0.5 and Phase 1.0 of the Superconducting RF Test Facility (STF) have been developed since 2005 in KEK. We have completed the two rf-sources and they have been used for the evaluation for the components of power distribution system (PDS) and couplers which were installed in the 5m-cryomodules. We have developed some rf components which is used in the power distribution system(PDS). Phase 1.0 have been conducted now and we attempt the R&D of PDS required in ILC project. This report describes the recent status of the rf source of STF in KEK including the modulator, PDS and LLRF. |