Paper | Title | Page |
---|---|---|
THP076 | Last SPIRAL 2 10 kW CW RF Coupler Design | 969 |
|
||
The first tests of the SPIRAL 2 coupler have been done successfully in the B-cryomodule of the SPIRAL2 linac. It led to an updated design. We present the new design as well as the results of the last test and conditioning. |
||
|
||
THP009 | RF and Cryogenic Tests of the First Beta 0.12 SPIRAL2 Cryomodule | 792 |
|
||
The SPIRAL2 project, installed in GANIL for Radioactive Ion Beam physics purposes requires the manufacturing of a multi beam driver. This driver is based on a superconducting Linac featuring two 88 MHz Quarter Wave Resonator families. IPN Orsay is in charge of the study and the assembly of the 7 high energy (beta = 0.12) cryomodules. Each cryomodule is composed of two QWRs, specified to operate at 4.2 K with a nominal accelerating gradient of 6.5 MV/m. A first qualifying cryomodule has been manufactured and tested at the beginning of 2008 in order to validate the resonator and the cryostat design before launching the serial production of the 6 remaining cryomodules. The paper presents the main results of this test and the cryomodule design in its final version. |