A   B   C   D   E   F   G   H   I   J   K   L   M   N   O   P   Q   R   S   T   U   V   W   X   Y   Z  

Ratzinger, U.

Paper Title Page
MOP001 A Coupled RFQ-Drift Tube Combination for FRANZ 46
 
  • A. Bechtold, U. Bartz, M. Heilmann, P. Kolb, H. Liebermann, O. Meusel, D. Mäder, H. Podlech, U. Ratzinger, A. Schempp, C. Zhang
    IAP, Frankfurt am Main
  • G. Clemente
    GSI, Darmstadt
 
 

Funding: Work supported by BMBF
The Frankfurt Neutron Source at the Stern-Gerlach-Zentrum will comprise a short 175 MHz linac sequence consisting of a 1.4 m long 700 keV 4-rod type RFQ followed by a 50 cm IH-DTL for proton acceleration up to 2 MeV. The beam current is 200 mA at pulsed and 30 mA at cw operation. The aim is to have a very compact device driven by only one rf amplifier to reduce costs and required installation space. A coupling between the RFQ and the IH resonators by means of a galvanic connection is foreseen, which is realized by two brackets going right away through a common partitioning end flange lid. The accelerators could also be driven separately by just removing the brackets. The distance between the end of the RFQ electrodes and the middle of the first DTL gap is only 5 cm, there is no additional beam optics in between. Preliminary beam dynamics and rf simulations have been carried out together with accompanying measurements on rf models.

 
MOP002 Injector Development for High Intensity Proton Beams at Stern-Gerlach-Zentrum 49
 
  • O. Meusel, A. Bechtold, L.P. Chau, M. Heilmann, H. Podlech, U. Ratzinger, K. Volk, C. Wiesner
    IAP, Frankfurt am Main
 
 

The Frankfurter neutron source at Stern-Gerlach-Zentrum (SGZ) uses a proton injector as a driver for the 7Li(p,n) neutron production. A volume type ion source will deliver a 100 keV, 200 mA proton beam continuously. It is intended to use a LEBT section consisting of four solenoids to transport the beam and to match it into the acceptance of the RFQ. A chopper system between solenoid 2 and 3 will provide beam pulses with a length of about 100 ns with a repetition rate of 250 kHz. The RFQ and the following IH drift tube LINAC will be coupled together to achieve an efficiency beam acceleration. Furthermore only one power amplifier will be needed to provide the rf power for both accelerator stages. The Mobley type bunch compressor will merge 7 micro-bunches formed in the accelerator module to one single 1ns bunch with an estimated peak current of about 8.6 A. A rebuncher will provide the post acceleration at a final beam energy adjustable between 1.8 and 2.4 MeV. The whole injector suffers from the high beam intensity and therefore high space charge forces. It will gives the opportunity to develop new accelerator concepts and beam diagnostic technics.

 
MOP019 The HITRAP Decelerator Project at GSI - Status and Commissioning Report 100
 
  • L.A. Dahl, W. Barth, P. Gerhard, F. Herfurth, M. Kaiser, O.K. Kester, H.J. Kluge, S. Koszudowski, C. Kozhuharov, G. Maero, W. Quint, A. Sokolov, T. Stöhlker, W. Vinzenz, G. Vorobjev, D.F.A. Winters
    GSI, Darmstadt
  • B. Hofmann, J. Pfister, U. Ratzinger, A.C. Sauer, A. Schempp
    IAP, Frankfurt am Main
 
 

For injection into the ion trap facility HITRAP, the GSI accelerator complex has the unique possibility to provide beams of highly stripped ions and even bare nuclei up to Uranium at an energy of 4 MeV/u. The HITRAP facility consists of linear 108 MHz-structures of IH- and RFQ-type to decelerate the beams further down to 6 keV/u for capturing in a large penning trap for cooling purpose. The installation is completed except of the RFQ-tank. During commissioning periods in 2007 64Ni28+ and 20Ne10+ beam was used to investigate the beam optics from the experimental storage ring extraction to the HITRAP double-drift-buncher system. In 2008 the IH-structure decelerator and the downstream matching section was examined with 197Au79+ beam. Comprehensive beam diagnostics were installed: Faraday cups, tubular and short capacitive pick ups, SEM grids, YAG scintillation screens, a single shot pepperpot emittance meter, and a diamond detector for bunch shape measurements. Results of the extensive measurements are presented.

 
TUP074 Commissioning of the HITRAP Decelerator Using a Single-Shot Pepper Pot Emittance Meter 564
 
  • J. Pfister, R. Nörenberg, U. Ratzinger
    IAP, Frankfurt am Main
  • W. Barth, L.A. Dahl, P. Forck, F. Herfurth, O.K. Kester, T. Stöhlker
    GSI, Darmstadt
 
 

Funding: Work supported by BMBF under contract 06FY160I.
The Heavy highly charged Ion TRAP (HITRAP) project at GSI is in the commissioning phase. Highly charged ions up to U92+ provided by the GSI accelerator facility will be decelerated and subsequently injected into a large Penning trap for cooling to the MeV/u energy level. A combination of an IH- and an RFQ-structure decelerates the ions from 4 MeV/u down to 6 keV/u. In front of the decelerator a double drift-buncher-system is provided for phase focusing and a final de-buncher integrated in the RFQ-tank reduces the energy spread in order to improve the efficiency for beam capture in the cooler trap*. This contribution concentrates on the beam dynamics simulations and corresponding measurements in the commissioning beam times up to the position of the entrance to the RFQ. Single-shot emittance measurements at higher energies using the GSI pepper pot device and construction of a new device using Micro-Channel Plate technology for low energies as well as profile measurements are presented.


*HITRAP webpage of AP division at GSI, http://www.gsi.de/forschung/ap/projects/hitrap/index_e.html

 
THP011 Recent Developments on Superconducting CH-Structures and Future Perspectives 797
 
  • H. Podlech, M. Amberg, A. Bechtold, M. Busch, F.D. Dziuba, U. Ratzinger, C. Zhang
    IAP, Frankfurt am Main
 
 

Funding: GSI, BMBF contr. No. 06F134I, EU contr. No. 516520-FI6W, RII3-CT-2003-506395, EFDA/99-507ERB500CT990061
Worldwide there is an increasing interest in new high intensity proton and ion driver linacs with beam powers up to several MW. A very challenging part of these accelerators is the low and medium energy section up to 100 MeV. Depending on the duty cycle room temperature or superconducting options are favoured. In both cases the Crossbar-H-mode (CH)-structure, developed at the IAP in Frankfurt is an excellent candidate. Room temperature as well as superconducting prototype cavities have been developed and tested successfully. A superconducting 19 cell low energy (beta=0.1) CH-cavity at 360 MHz reached effective gradients of 7 MV/m corresponding to an accelerating voltage of 5.6 MV. This cavity could be used for high intensity, cw operated linacs like accelerator driven systems (ADS, EUROTRANS) or the international fusion material irradiation facility (IFMIF). Additionally, the new proton injector for FAIR (325 MHz, 70 mA, 70 MeV) will use room temperature CH-cavities. Recent developments of this new type of a multi-cell drift tube cavity, beam dynamics issues and the tests of the prototypes will be presented.

 
TUP120 EBIS Preinjector Construction Status 685
 
  • J.G. Alessi, D.S. Barton, E.N. Beebe, S. Bellavia, O. Gould, A. Kponou, R.F. Lambiase, E.T. Lessard, V. LoDestro, R. Lockey, M. Mapes, D.R. McCafferty, A. McNerney, M. Okamura, A. Pendzick, D. Phillips, A.I. Pikin, D. Raparia, J. Ritter, J. Scaduto, L. Snydstrup, M. Wilinski, A. Zaltsman
    BNL, Upton, Long Island, New York
  • U. Ratzinger, A. Schempp
    IAP, Frankfurt am Main
 
 

Funding: Work supported by the US Department of Energy and the National Aeronautics and Space Agency
A new heavy ion preinjector is presently under construction at Brookhaven National Laboratory. This preinjector uses an Electron Beam Ion Source (EBIS), and an RFQ and IH Linac, both operating at 100 MHz, to produce 2 MeV/u ions of any species for use, after further acceleration, at the Relativistic Heavy Ion Collider, and the NASA Space Radiation Laboratory. Among the increased capabilities provided by this preinjector are the ability to produce ions of any species, and the ability to switch between multiple species in 1 second, to simultaneously meet the needs of both physics programs. Fabrication of all major components for this preinjector is in process, with testing of the EBIS and RFQ starting this year. The status of this construction will be presented.

 

slides icon

Slides