A   B   C   D   E   F   G   H   I   J   K   L   M   N   O   P   Q   R   S   T   U   V   W   X   Y   Z  

Nuhn, H.-D.

Paper Title Page
TUP043 Development of a Beam Loss Monitor System for the LCLS Undulator Beamline 492
 
  • W. Berg, J.C. Dooling, A.F. Pietryla, B.X. Yang
    ANL, Argonne
  • H.-D. Nuhn
    SLAC, Menlo Park, California
 
 

Funding: Work Argonne supported by the U.S. Department of Energy, Office of Science, Office of Basic Energy Sciences, under contract number DE-AC02-06CH11357.
A Beam-Loss Monitor (BLM) system based on the detection of Cerenkov radiation is in development at the Advanced Photon Source (APS) for the Linac Coherent Light Source (LCLS) free-electron laser. The electron beam will vary in energy nominally from 4 to 14 GeV with a beam charge of 0.2 to 1.0 nC and a maximum repetition rate of 120 Hz. To limit radiation-induced demagnetization of the undulator permanent magnets, the BLM will provide beam-loss threshold detection as part of the Machine Protection System (MPS). The detector incorporates a large volume (30 cc) fused silica Cerenkov radiator coupled to a photomultiplier tube (PMT). The output of the PMT is conditioned locally by a charge amplifier circuit and then digitized at the front end of the MPS rack electronics. During commissioning, the device will be calibrated by inserting a 1-micron aluminum foil into the beam, upstream of the undulator magnets. The present design calls for five BLM detector units to be distributed throughout the 33 undulator magnets. Beam-based testing is to begin at the APS storage ring during the summer of 2008. Details and status of the detector hardware, electronics, and simulations will be discussed.

 
TUP048 Identifying Jitter Sources in the LCLS Linac 506
 
  • F.-J. Decker, R. Akre, A. Brachmann, W.S. Colocho, Y.T. Ding, D. Dowell, P. Emma, J.C. Frisch, A. Gilevich, G.R. Hays, P. Hering, Z. Huang, R.H. Iverson, K.D. Kotturi, A. Krasnykh, C. Limborg-Deprey, H. Loos, S. Molloy, H.-D. Nuhn, D.F. Ratner, J.L. Turner, J.J. Welch, W.E. White, J. Wu
    SLAC, Menlo Park, California
 
 

The beam stability for the Linac Coherent Light Source (LCLS) Free-Electron Laser (FEL) at Stanford Linear Accelerator Center (SLAC) are critical for X-Ray power, pointing, and timing stability. Studies of the transverse, longitudinal, and intensity stability of the electron beam are presented. Identifying these sources by different methods like correlations, frequency spectrum analysis and other methods is critical for finally eliminating or reducing them.

 

slides icon

Slides

 
FR102 Commissioning of the LCLS Linac 1095
 
  • H. Loos, R. Akre, A. Brachmann, F.-J. Decker, Y.T. Ding, D. Dowell, P. Emma, J.C. Frisch, A. Gilevich, G.R. Hays, P. Hering, Z. Huang, R.H. Iverson, C. Limborg-Deprey, A. Miahnahri, S. Molloy, H.-D. Nuhn, J.L. Turner, J.J. Welch, W.E. White, J. Wu
    SLAC, Menlo Park, California
  • D.F. Ratner
    Stanford University, Stanford, Califormia
 
 

Funding: This work was supported by U.S. Department of Energy, Office of Basic Energy Sciences, under Contract DE-AC02-76SF00515
Construction of the Linac Coherent Light Source (LCLS) X-ray free electron laser at the Stanford Linear Accelerator Center (SLAC) is nearing completion. A new injector and upgrades to the existing accelerator were installed in two phases in 2006 and 2007. We report on the commissioning of the injector, the two new bunch compressors at 250 MeV and 4.3 GeV, and transverse and longitudinal beam diagnostics up to the end of the existing linac at 13.6 GeV. The commissioning of the new transfer line from the end of the linac through the undulator beam line to the main dump is scheduled to start in January 2009 and for the undulator magnets in March 2009 with first light to be expected by May 2009.

 

slides icon

Slides