A   B   C   D   E   F   G   H   I   J   K   L   M   N   O   P   Q   R   S   T   U   V   W   X   Y   Z  

Inagaki, T.

Paper Title Page
THP085 Cooling System Design of Compact Klystron Modulator Power Supply in the XFEL Project at SPring-8 987
 
  • C. Kondo
    RIKEN Spring-8 Harima, Hyogo
  • T. Inagaki, T. Sakurai, T. Shintake, K. Shirasawa
    RIKEN/SPring-8, Hyogo
 
 

A klystron modulator power supply for XFEL project at SPring-8 has been developed, which concepts are a compact body, a low noise, and a good stability. The cooling system of the power supply is one of the most important key for the stable modulator. For example, temperature change of insulation oil in the tank caused drift of the klystron voltage, and higher oil temperature deteriorates insulation oil and electric components. We adopted simple and compact cooling systems utilizing natural conviction cooling, because of low costs, limited space, and maintenance free. In order to estimate the requisite cooling ability, we designed four types of cooling panels and measured the natural conviction heat transfer coefficient between the oil and each cooling panels. Using the results, we designed cooling systems composed of water cooling panels placed on the side walls and a water pipe hanged from the ceiling panel. The temperature of the inner oil of the power supply in the rated operation was suppressed below 43 degree C, which is agreed with our expectation. In this paper we present the design and ability of the power supply, and the key point of oil cooling.

 
FR101 8-GeV C-Band Accelerator Construction for XFEL/SPring-8 1090
 
  • T. Inagaki
    RIKEN/SPring-8, Hyogo
 
 

The 8 GeV C-band electron linear accelerator is under construction at the SPring-8 site aiming at generating an FEL X-ray beam in 2010. C-band accelerator technology has been developed initially at KEK for the e+e- linear collider project, and employed at the XFEL project in Japan. Since C-band generates a high gradient acceleration field as high as 35 MV/m, the total length of the accelerator fits within 400 m, including the injector and three bunch compressors. C-band uses normal conducting rf technology, thus it runs in pulse mode at 60 Hz, which is well suited to XFEL operation and is less expensive. The talk will cover the current status of the XFEL project and hardware production.

 

slides icon

Slides